My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BHA #4
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
BHA #4
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/13/2011 4:15:23 PM
Creation date
11/17/2010 9:36:42 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of Sunny Isles Beach Experience: Since 2001, BHA has performed professional engineering <br />services on several projects/ assignments done specifically for the City of Sunny Isles Beach <br />(reference: Rick Conner, City Manager, (305) 792-1928 and Jorge Vera, Assistant City Manager, (786) <br />202-1157). The projects include: <br /> <br />1. City of Sunny Isles Beach Miscellaneous Consultant Services AGreement (2001) <br />A. Administration and assistance with regard to the Local Area Program (LAP) <br /> <br />B. Assistance with the appropriations application from the State of Florida, for $500,000 <br />towards the Golden Shores Stormwater Project <br /> <br />C. Assistance and administration in meeting the requirements of the "NPDES" Program <br /> <br />D. Other various items requiring engineering consultation <br />2. City of Sunny Isles Beach PhotGrammetric and MapppinG Consultant AGreement (2001) <br /> <br />3. City of Sunny Isles Beach Golden Shores DrainaGe System and Street Improvements Consultant <br />AGreement (2001) <br /> <br />A. Evaluation of Drainage Problems and Street Improvements <br /> <br />B. Topographical survey, final street and drainage design, pavement improvements, <br />pavement markings and signalization <br /> <br />C. Contract documents, specifications, technical assistance during bidding and <br />miscellaneous engineering services <br /> <br />4. City of Sunny Isles Beach Golden Shores DrainaGe System Technical Assistance Consultant <br />AGreement (2001) <br /> <br />5. City of Sunny Isles Beach Golden Shores DrainaGe System Proiect OversiGht (Construction <br />Inspection) Consultant AGreement (2002) <br /> <br />6. City of Sunny Isles Beach ConsultinG AGreement for 2002 NPDES Permit Application (2003) <br /> <br />7. City of Sunny Isles Beach Consultant AGreement (2003) <br />A. Value Engineering for Senator Gwen Margolis Park Drainage Improvement <br /> <br />8. City of Sunny Isles Beach ConsultinG AGreement (2004) <br />A. Photogrammetric and Mapping Services <br /> <br />9. City of Sunny Isles Beach Consultant AGreement Contract No. 04-03628-01 Central island <br />DrainaGe and Street Improvement Proiect (2003-2010) <br />A. Central Island Stormwater Drainage including design, technical assistance and bidding <br />process <br /> <br />B. Bicycle Path design and implementation <br /> <br />C. Design required to incorporate undergrounding utilities information <br /> <br />D. Design required to have curbs and gutters on all of the streets <br /> <br />E. Construction Engineering & Inspection and project management <br /> <br />F. Additional pre-construction, design and CEI services for increased parking, street <br />lighting, landscaping and additional improvements to Gwen Margolis Park including: <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.