Laserfiche WebLink
<br />a. Bidding assistance and technical services in support of legal challenge to bid process <br />b. CEI services on NE 183rd Street <br /> <br />c. Technical services for pre-construction and CEI services for initial construction on <br />Central Island drainage <br /> <br />d. CEI services on Central island drainage including landscaping, lighting and Gwen <br />Margolis park <br /> <br />e. Design services for Central island lighting, landscaping, park and drainage <br />improvements <br /> <br />f. FPL easements for converting the existing overhead electrical service to <br />underground on Church Drive on NE 178th Drive <br /> <br />g. Municipal Parking lot on NE 175th Terrace: adding several drainage structures and <br />pipe <br /> <br />h. Foundation slab design at restroom building in Gwen Margolis Park <br /> <br />i. Design and permitting for water distribution/sewer collection plan for restroom <br />building and Gwen Margolis Park <br /> <br />j. Underground electrical conversion design (performed by subconsultant) <br /> <br />k. Additional Outfall Improvements @ NE 183rd Street and North Bay Road <br /> <br />10. (BHA as subconsultant) North Bay Road Pedestrian Bridae and Observation Deck (2007-2010) <br />A. Bridge design <br /> <br />11. (BHA as subconsultant) New Port Fishina Pier Replacement (2008-2010) <br />A. Pier/bridge design <br />B. Architectural! structural design for restaurant <br /> <br />12. City of Sunny Isles Beach 183rd St. Streetscape Improvements (2009-1010) <br />A. Construction engineering * inspection (CEI) <br />B. EEO reporting <br />C. ARRA auditing <br /> <br />a. Reference Project Name/Address: City of Sunny Isles Beach, Florida <br /> <br />Reference Project Description: <br />Scope of Services Provided: <br /> <br />Central Island Drainage and Street Improvements <br /> <br />Value engineering of existing drainage design, evaluation of <br />drainage alternative, preliminary design final pavement <br />rehabilitation and drainage design using deep wells and <br />technical assistance during bidding process. <br /> <br />Beiswenger, Hoch and Associates was invited to evaluate a <br />previously design stormwater drainage system. BHA <br />evaluated that system and upon an environmental, <br />feasibility and cost evaluation, recommended for a new <br />design using a series of drainage wells interconnected for <br />flow equalization. The system recommended by BHA <br />eliminated direct outfalls to the ecological sensitive <br />Dumbfoundling Bay. <br /> <br /> <br />,J <br /> <br />4 <br />