My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wolfberg Alvarez & Partners
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Wolfberg Alvarez & Partners
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 9:55:44 AM
Creation date
11/17/2010 9:55:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S 20, Example Project Key <br />QUALIFICATIONS FOR THIS CONTRACT Number <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. 3 <br />Complete section F for each project.) <br /> <br />21, TITLE AND LOCATION (City and State) <br />General NE Consulting for the Village of Palmetto Bay, Pal- <br />metto Bay, FL <br /> <br />22. Year Completed <br />Professional Services Construction (if applicable) <br />2006 2009 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />Village of Palmetto Bay <br /> <br />b, POINT OF CONTACT NAME <br />Ed Silva <br /> <br />c, POINT OF CONTACT TELEPHONE NUMBER <br />305-259-1324 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) <br /> <br />WA provided multi-disciplined engineering and <br />architectural support services for the Village on a <br />variety of projects, These projects included con- <br />struction costs ranging from $500,000 per task to <br />$1,000,000. <br /> <br />. Preparation of studies and reports <br />. Planning, design of building additions and <br />improvements <br />Upgrading of engineering systems <br />. Site planning and improvements <br />. Preparation of construction documents <br />. Construction phase services. <br /> <br />The firm provided architectural and engineering <br />services to the Village for its new 9,000 SF Li- <br />brary and Community Center as part of a General <br />Consulting Contract with the Village. The Library <br />and Community Center will be utilized as a meet- <br />ing place within the community for a variety of <br />seminars and events, The Library which encom- <br />passes an area of approximately 5,000 SF, <br /> <br />Cost: $2,890,000 <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br />(1) FIRM NAME <br />a. WOLFBERG ALVAREZ & PARTNERS <br /> <br />Wolfberg Alvarez and Partners <br /> <br />(2) FIRM LOCATION <br />Coral Gables, FL <br /> <br />(3) ROLE <br />Prime Consultant. Project man- <br />agement, architecture. me- <br />chanical, electrical and plumb- <br />ing. cost estimating, construc- <br />tion management <br /> <br />STANDARD FORM 330 (1/2004) <br />
The URL can be used to link to this page
Your browser does not support the video tag.