My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Wolfberg Alvarez & Partners
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Wolfberg Alvarez & Partners
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 9:55:44 AM
Creation date
11/17/2010 9:55:31 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Complete section F for each project.) <br /> <br />20, Example Project <br />Key Number <br />4 <br /> <br />21, TITLE AND LOCATION (City and State) <br />NASA Operations Support Building II, <br />Kennedy Space Center, FL <br /> <br />22. Year Completed <br />Professional Services Construction (if applicable) <br />2005 2007 <br /> <br />a. PROJECT OWNER <br />NASA <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />b, POINT OF CONTACT NAME c. POINT OF CONTACT TELEPHONE NUMBER <br />Brain Graf 321-867-6039 <br /> <br />24, BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size and cost) <br /> <br />Cost $27,000,000 <br /> <br /> <br />II <br />D <br /> <br />WA provided architectural and engineering services for the <br />design of a new 200,000 GSF Operations Support Build- <br />ing, This project, currently under construction, involves the <br />demolition of existing substandard modular offices and <br />trailers within the Launch Complex 39 area (LC-39), and <br />replacing them with a new multi-story building, The com- <br />plex will support operational areas and consists of office <br />spaces, training rooms, computer rooms, multi-media con- <br />ference rooms, Mission Conference Center with observa- <br />tion deck, technical libraries, Exchange store, snack barf <br />cafeteria, storage, internal and external employee break <br />areas, miscellaneous support areas and parking. <br /> <br />MEP System <br />The HVAC systems for this facility consist of a central station <br />chilled water air handling units, tertiary chilled water pumps, elec- <br />tric resistance heaters, chilled water piping, supply ventilation <br />fans, exhaust fans, sheet metal ductwork, variable air volume <br />boxes, The facility system shall be connected to central utilities, <br />central control systems, which shall include any necessary system <br />upgrades to support the complex. The project shall include the <br />removal of the existing substandard modular housing and trailers <br />in the K6-1200 area and site restoration, <br /> <br />a. <br /> <br />(1) FIRM NAME <br />Wolfberg Alvarez & Partners <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br />(2) FIRM LOCATION <br />Coral Gables, FL <br /> <br />(3) ROLE <br />Prime <br /> <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION <br /> <br />(3) ROLE <br /> <br />b. <br /> <br />(1) FIRM NAME <br /> <br />(2) FIRM LOCATION <br /> <br />(3) ROLE <br /> <br />c. <br /> <br />Wolfberg Alvarez and Partners <br /> <br />STANDARD FORM 330 (1/2004) <br />
The URL can be used to link to this page
Your browser does not support the video tag.