<br />12, NAME
<br />
<br />E, RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE
<br />
<br />Clifford R. Loutan, P,E,
<br />
<br />Director of Design
<br />15. FIRM NAME AND LOCATION (City and State)
<br />
<br />Project Manager
<br />
<br />a, TOTAL
<br />
<br />b. WITH CURRENT FIRM
<br />
<br />14.5
<br />
<br />14
<br />
<br />
<br />17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE)
<br />
<br />Bachelor of Science (Civil Engineering), 1995 Professional Engineer, Florida
<br />
<br />Civil Engineering
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />Mr. Loutan has successfully managed numerous public and private projects throughout South Florida and is actively
<br />involved in all projects leaving this office,
<br />COE projects described herein.
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> City of Coconut Creek Master Lift Station # 12 PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Coconut Creek, Florida 2009 On-going
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br /> Design, permitting and complete overhaul of existing master lift station
<br /> within the City of Coconut Creek, Project entailed demolition of existing
<br /> station and installation of new wet well, pumps, control panel and
<br /> generator, Cost: $1.30 million.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> City of Sunrise Public Safety Complex & Fire Station # 32 PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Sunrise, Florida 2009 Under Construction
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br /> Civil engineering design, permitting and construction administration for the
<br /> City of Sunrise Public Safety Complex and Fire Station # 72.
<br /> This project included the design and permitting of a surface water
<br /> management system and modification of the overall system to support a
<br /> 131,800 s,f. building on a 7.25 acre parcel of vacant property. Also
<br /> included was the design and permitting of a Water distribution and
<br /> Sanitary sewer collection system to support said development, Estimated
<br /> cost: $32 million.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> City of Wilton Manors Lift Station # 8 PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Wilton Manors, Florida 2007 2008
<br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br /> Project involved the design, permitting and complete overhaul of an
<br /> existing active master lift station within the City of Wilton Manors, Project
<br /> also included analysis of existing and proposed sewage demand,
<br /> evaluation of existing dry well system, reversal of active sewage flow,
<br /> demolition of existing system and design & installation of new wet well,
<br /> pumps and control panel to serve sewage demands. Cost: $ 425,000
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Federal Aviation Administration Building PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Miramar, Florida, 2007 2009
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ! L:J Check if project performed with current firm
<br /> Site plan preparation & processing and design, permitting & construction
<br /> inspection of water, sewer, paving & drainage, roadway design and
<br /> surveying, in association with a 58,361 square foot Federal Aviation
<br /> Administration Office Building, Contract total: $44,450.
<br />
<br />19. RELEVANT PROJECTS
<br />
|