Laserfiche WebLink
<br />12, NAME <br /> <br />E, RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE <br /> <br />Clifford R. Loutan, P,E, <br /> <br />Director of Design <br />15. FIRM NAME AND LOCATION (City and State) <br /> <br />Project Manager <br /> <br />a, TOTAL <br /> <br />b. WITH CURRENT FIRM <br /> <br />14.5 <br /> <br />14 <br /> <br /> <br />17, CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br /> <br />Bachelor of Science (Civil Engineering), 1995 Professional Engineer, Florida <br /> <br />Civil Engineering <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />Mr. Loutan has successfully managed numerous public and private projects throughout South Florida and is actively <br />involved in all projects leaving this office, <br />COE projects described herein. <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Coconut Creek Master Lift Station # 12 PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Coconut Creek, Florida 2009 On-going <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Design, permitting and complete overhaul of existing master lift station <br /> within the City of Coconut Creek, Project entailed demolition of existing <br /> station and installation of new wet well, pumps, control panel and <br /> generator, Cost: $1.30 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Sunrise Public Safety Complex & Fire Station # 32 PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Sunrise, Florida 2009 Under Construction <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Civil engineering design, permitting and construction administration for the <br /> City of Sunrise Public Safety Complex and Fire Station # 72. <br /> This project included the design and permitting of a surface water <br /> management system and modification of the overall system to support a <br /> 131,800 s,f. building on a 7.25 acre parcel of vacant property. Also <br /> included was the design and permitting of a Water distribution and <br /> Sanitary sewer collection system to support said development, Estimated <br /> cost: $32 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Wilton Manors Lift Station # 8 PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Wilton Manors, Florida 2007 2008 <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Project involved the design, permitting and complete overhaul of an <br /> existing active master lift station within the City of Wilton Manors, Project <br /> also included analysis of existing and proposed sewage demand, <br /> evaluation of existing dry well system, reversal of active sewage flow, <br /> demolition of existing system and design & installation of new wet well, <br /> pumps and control panel to serve sewage demands. Cost: $ 425,000 <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Federal Aviation Administration Building PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Miramar, Florida, 2007 2009 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ! L:J Check if project performed with current firm <br /> Site plan preparation & processing and design, permitting & construction <br /> inspection of water, sewer, paving & drainage, roadway design and <br /> surveying, in association with a 58,361 square foot Federal Aviation <br /> Administration Office Building, Contract total: $44,450. <br /> <br />19. RELEVANT PROJECTS <br />