Laserfiche WebLink
<br />12, NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT 14. YEARS OF EXPERIENCE <br /> <br />William C, Lips, P.E. <br /> <br />Director of Engineering <br />15. FIRM NAME AND LOCATION (City and State) <br /> <br />Project Manager <br /> <br />a, TOTAL <br /> <br />b. WITH CURRENT FIRM <br /> <br />11 <br /> <br />5.5 <br /> <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br /> <br />Bachelor of Science (Civil Engineering), 1995 Professional Engineer, Florida <br /> <br />Civil Engineering <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />Mr. Lips has designed and supervised numerous Civil Engineering projects within the Tri-county area. He plays a key role <br />in the design, permitting and construction administration of several projects, <br />CaE projects described herein. <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> YMCA Village Carver PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Miami, Florida 2006 2010 <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, elc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Water main extension, stormwater improvements and road re- <br /> construction of City of Miami R. O. W. (NW 71s1 Street), adjacent to project <br /> limits. Contract total: $120,000. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Broward County Public Libraries PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Weston, Florida. 2004 2006 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Project involved the design, permitting and construction inspections of <br /> site utility infrastructure associated with a 30,000 square foot Broward <br /> County Library and off-site roadway improvement to Bonaventura <br /> Boulevard to serve proposed construction. Estimated cost: $7 million <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Broward County Public Libraries PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Miramar, Florida, 2005 2007 <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Project involved the design, permitting and construction inspections of site <br /> work associated with a 90,000 square foot County Library (1st floor), Nova <br /> College (2"d floor) and Broward Community College (:fd floor), Project <br /> also included site utility infrastructure (water distribution system, sewer <br /> collection system, surface water management system and construction of <br /> on-site parking facilities.) Estimated cost: $ 18 million <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Mounts P.U.D. PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> West Palm Beach, FL 2005 2009 <br />d, (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Site Planning and Civil Engineering design of 34 acre- 87 unit single <br /> family residential housing development, Project required extensive off- <br /> site improvements including construction of a temporary bridge, removal <br /> and construction of new bridge. Adjacent roadway and utility <br /> improvements and maintenance of traffic throughout construction. <br /> Contract total: $190,000, <br /> <br />19. RELEVANT PROJECTS <br />