|
<br />12. NAME
<br />Jean-Claude Fontaneau
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT
<br />Project Engineer a. TOTAL
<br />12
<br />
<br />14. YEARS EXPERIENCE
<br />lb. WITH CURRENT FIRM
<br />10
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />SRS Engineering, Inc. Miami, FL
<br />16. EDUCATION (DEGREE AND SPECIALlZA nON)
<br />B.S, Civil Engineering
<br />Florida International University, Miami, FL- 1996
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Engineer Intern- Jan. 1999 State of Florida
<br />No, 1100004978
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Fluent in English, French and Spanish
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Miller Drive Widening PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Miami, Florida 02/2005 04/2006
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE lv" I Check if project periormed with current firm
<br />a, Provided engineering design, preparation of construction documents, permitting assistance and construction
<br /> phase support services to the Miami-Dade County Public Works Department for the widening of Miller Dr.
<br /> between SW 152nd and SW 158 Ave, including preparation of designs for the construction of drainage
<br /> improvements associated with the roadway reconstruction,
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> City of Hialeah - West 36th Avenue PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Hialeah, Florida 06/2007 12/2008
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project periormed with current firm
<br />b, Engineering design, preparation of construction documents, plan permitting (DERM), and pre-construction
<br /> phase support services to the City of Hialeah for the construction of W. 36th Avenue between N,W. 138th
<br /> Street and N,W, 154th Street.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Florida Memorial University - Main Entrance Road PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Miami, Florida 12/2003 12/2003
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE i{J Check if project periormed with current firm
<br />C, Provided engineering design and construction support services to Florida Memorial College for
<br /> the construction of the new main campus entrance road and relocation of existing utilities along
<br /> Wilkie D, Ferguson Way. The new campus entrance road connects the campus with N.W. 42nd
<br /> Avenue.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Homestead Air Reserve Base - Job Corps Center PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable)
<br /> Homestead, Florida 2000 2001
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project periormed with current firm
<br />d, Project Engineer for civil engineering design and construction management of a 15-building/40 acre site
<br /> including paving, grading, drainage system, water and sewer systems, and fire protection lines. Work
<br /> included design, permitting and construction administration of upgrades to pump station No, 934 and sewer
<br /> force main extensions to meet MDWASD standards.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Roberts International Airport, Land side Master Plan Improvements PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Cayman Islands 4/2006 12/2007
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE :iJ Check if project periormed with current firm
<br />e, Design and preparation of documents for construction of land side master plan improvements including
<br /> design of site master plan, geometry plan, demolition plan, paving, grading and drainage, new main entrance
<br /> road, parking and curbside loading/unloading areas. Sewer systems improvements included design of new
<br /> treatment plant, pump station and force main.
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 2
<br />
|