Laserfiche WebLink
<br />12. NAME <br />Oliverio Sanchez, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Civil Engineer/ Senior Project a. TOTAL b. WITH CURRENT FIRM <br /> <br />33 <br /> <br />5 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />SRS Engineering, Inc. Miami, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA TlON) <br />B,S, Civil Engineering <br />University of Havana, Cuba-1973 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />1974- Professional Engineer (Florida) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />PostGraduate course in Structural Analysis- 1979 <br />Course of Airport Pavement Rehabilitation, University of Texas, Austin- 1993; Fluent in Spanish <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> FEMA DORM Master Consultants PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami-Dade County, Florida 12/2005 12/2005 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE lyj Check if project pertormed with current firm <br />a, Project Manager/ Master Consultant for this FEMAlDORM project. As a Master Consultant we are <br /> responsible for the coordination of the design and construction of approx.490 mitigation projects. These <br /> projects range from drainage improvements to total roadway reconstruction with an estimated construction <br /> value of $35,000,000.00. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Hialeah Pump Station 200 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Hialeah, Florida 02/2006 On-Going <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project pertormed with current firm <br />b, Hydraulic analysis of proposed force main; determined size of line and verified compliance with previously <br /> prepared Annex Area W&S Master Plan. Prepared documents for the construction of 8.43 MGD <br /> regional/booster sewer pump station consisting of a two-story weUdry well building with four 470-HP pumps, <br /> electrical control systems, telemetry and odor control system. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami-Dade County Construction Inspection Services PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 10/2007 10/ 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project pertormed with current firm <br />C, Provided construction inspection services to Miami-Dade County (Public Works and DERM), Responsible for <br /> supplying engineering and construction inspection services to the County on roadway and drainage <br /> improvement construction projects. SOW included overseeing, coordinating and inspecting the work of <br /> design consultants, surveyors and contractors. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> South Florida Evaluation and Treatment Center PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Florida City, Florida 6/2006 6/2006 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project pertormed with current firm <br />d, Engineering design of on-site paving, grading and drainage, surface water management design, off-site <br /> roadway improvements, on-site gravity sewer system, private sewer pump stations, force mains, on-site and <br /> off-site water systems, permitting and construction phase services including review of payment requests, <br /> responding to RFI, and conducting inspections. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Kendall Commons PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami, FL 08/2007 On-Going <br />e, (3) BRIEF DESCRIPTION (Brief scope, size, cost, elc.) AND SPECIFIC ROLE U Check if project pertormed with current firm <br />SRS prepared all civil engineering design plan and specifications for the construction of an approximately <br /> 160-acre traditional neighborhood district development comprised of 1,256 residential units, including <br /> townhouses, single family homes, live/work units, lofts and flats; as well as over 132,000 sq. ft, of commercial <br /> retail, 15-acre lake and a 9-acre school. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />