Laserfiche WebLink
<br />12. NAME <br />Ignacio Serralta, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br />Principal in Charge a. TOTAL b. WITH CURRENT FIRM <br />20 14 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />SRS Engineering, Inc. <br /> <br />Miami, FL 33155 <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA TlON) <br />B.S. Civil Engineering <br />California State University, Los Angeles, CA- 1988 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />1991- Civil Engineer- California C47828 <br />1992- Civil Engineer- Florida PE45609 <br />Uniform Building Code Inspector <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Fluent in English and Spanish <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> FEMA DORM Master Consultants PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami-Dade County, Florida 12/2005 12/2005 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~~ Check if project performed with current firm <br />a, Principal in Change/ Master Consultant for this FEMA/DORM project. As a Master Consultant we are <br /> responsible for the coordination of the design and construction of approx. 490 mitigation projects. These <br /> projects range from drainage improvements to total roadway reconstruction with an estimated construction <br /> value of $35,000,000.00. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Miami - CEO - Pinehurst PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami, Florida 1/2006 1/2006 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 'L Check if project performed with current firm <br />b. Principal in Charge to the City of Miami to provide Construction Engineering and Observation Services for the <br /> administration of the Pinehurst Project which consisted of roadway and drainage construction. For this <br /> project, SRS provided full-time on-site inspection personnel and supervisor for the duration of the <br /> construction. Construction cost $2,360,000, <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami-Dade County - Three Lakes Park PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami, Florida OS/2003 07/2005 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />C, Provided engineering design, permitting and construction phase services for Three Lakes Park including site <br /> utilities, parking area, building site, play fields, access road, and walkways. Work included the design of 12" <br /> water main extension, gravity sewer main extension, paving, grading, and drainage plans for a 680 L.F, of <br /> access road and a 97 cars parking lot. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> NW 138 Street PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Hialeah, Florida 12/2008 On-Going <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, ete.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />d. SRS is currently engaged in the rendering of engineering design, preparation of construction <br /> documents, plans permitting (Miami-Dade County Public Works, DERM, SFWMD, & FDOT), <br /> pre-construction phase support services to the City of Hialeah for the construction of NW 138th <br /> Street between 1-75 and N,W, 107th Avenue. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City of Hialeah Annex Area - Water and Sewer PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Hialeah, Florida 02/2006 02/2006 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE :iJ Check if project performed with current firm <br />e, Engineering design of water and sewer infrastructure required to serve the newly annexed area to <br /> the City of Hialeah, Work included the preparation of construction documents including a water <br /> and sewer master plan to determine service needs, size and location/alignment of W&S main <br /> lines needed along the major arterial roadways. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 4 <br />