<br />12. NAME
<br />Ignacio Serralta, P.E.
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person.)
<br />13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br />Principal in Charge a. TOTAL b. WITH CURRENT FIRM
<br />20 14
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />SRS Engineering, Inc.
<br />
<br />Miami, FL 33155
<br />
<br />16. EDUCATION (DEGREE AND SPECIALlZA TlON)
<br />B.S. Civil Engineering
<br />California State University, Los Angeles, CA- 1988
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />1991- Civil Engineer- California C47828
<br />1992- Civil Engineer- Florida PE45609
<br />Uniform Building Code Inspector
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Fluent in English and Spanish
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> FEMA DORM Master Consultants PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Miami-Dade County, Florida 12/2005 12/2005
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~~ Check if project performed with current firm
<br />a, Principal in Change/ Master Consultant for this FEMA/DORM project. As a Master Consultant we are
<br /> responsible for the coordination of the design and construction of approx. 490 mitigation projects. These
<br /> projects range from drainage improvements to total roadway reconstruction with an estimated construction
<br /> value of $35,000,000.00.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> City of Miami - CEO - Pinehurst PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Miami, Florida 1/2006 1/2006
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE 'L Check if project performed with current firm
<br />b. Principal in Charge to the City of Miami to provide Construction Engineering and Observation Services for the
<br /> administration of the Pinehurst Project which consisted of roadway and drainage construction. For this
<br /> project, SRS provided full-time on-site inspection personnel and supervisor for the duration of the
<br /> construction. Construction cost $2,360,000,
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Miami-Dade County - Three Lakes Park PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Miami, Florida OS/2003 07/2005
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />C, Provided engineering design, permitting and construction phase services for Three Lakes Park including site
<br /> utilities, parking area, building site, play fields, access road, and walkways. Work included the design of 12"
<br /> water main extension, gravity sewer main extension, paving, grading, and drainage plans for a 680 L.F, of
<br /> access road and a 97 cars parking lot.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> NW 138 Street PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Hialeah, Florida 12/2008 On-Going
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, ete.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br />d. SRS is currently engaged in the rendering of engineering design, preparation of construction
<br /> documents, plans permitting (Miami-Dade County Public Works, DERM, SFWMD, & FDOT),
<br /> pre-construction phase support services to the City of Hialeah for the construction of NW 138th
<br /> Street between 1-75 and N,W, 107th Avenue.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> City of Hialeah Annex Area - Water and Sewer PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Hialeah, Florida 02/2006 02/2006
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE :iJ Check if project performed with current firm
<br />e, Engineering design of water and sewer infrastructure required to serve the newly annexed area to
<br /> the City of Hialeah, Work included the preparation of construction documents including a water
<br /> and sewer master plan to determine service needs, size and location/alignment of W&S main
<br /> lines needed along the major arterial roadways.
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 4