Laserfiche WebLink
<br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />{Present as many projects as requested by the agency, or 10 projects, if not specified, <br />Como/ete one Section F for each oroiect.! <br />21. TITLE AND LOCATION (City and State) <br /> <br />A.D. Barnes Park New Walkways & Parking Loti Miami Dade <br /> <br />County, Florida <br /> <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br /> <br />10 <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />1/2007 <br /> <br />12/2008 <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />MDC Parks & Rec, Dept. <br /> <br />b. POINT OF CO NT ACT <br />Pedro Nunez <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />305-775-7995 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br />SRS provided the engineering design, <br />permitting and construction phase services of <br />a walkway and bike path and parking lot. The <br />project is located within A.D. Barnes Park <br />along the Coral Gables Canal. The work <br />included the geometric design of the <br />walkways/bike paths and parking loti design <br />site paving, grading, and drainage plans. <br />Coordinating the work of subconsultants <br />including Surveyors, Geotechnical, electrical <br />site lighting and Landscaping. Our scope of <br />work also included preparing and submitting <br />permit applications and construction plans for <br />"dry-run" and "final" review by local <br />regulatory agencies including Miami-Dade <br />County Building Department, Miami-Dade <br />Public Works Dept., and DERM. <br /> <br />Construction Phase services included weekly <br />construction meetings, reviewing shop <br />drawings, responding to RFI's, providing <br />periodic construction observations, and <br />preparing close-out documents. <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a, SRS Engineering, Inc. Miami, FL 33155 Program Manager, Civil Engineering <br /> & Construction <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />t, <br /> <br />STANDARD FORM 330 (6/2004) PAGE 11 <br />