My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SRS Engineering, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
SRS Engineering, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 10:36:11 AM
Creation date
11/17/2010 10:35:47 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />20. EXAMPLE PROJECT <br />KEY NUMBER <br /> <br />F. EXAMPLE PROJECTS WHICH BEST ILLUSTRATE PROPOSED TEAM'S <br />QUALIFICATIONS FOR THIS CONTRACT <br />(Present as many projects as requested by the agency, or 10 projects, if not specified. <br />Com fete one Section F for each ro 'eel. <br /> <br />9 <br /> <br />21. TITLE AND LOCATION (City and State) <br />Chapman Field Park New Pedestrian Bike Paths & Parking <br />Lot, Miami Dade County, Florida <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> <br />8/2008 <br /> <br />On-going <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />MDC Parks & Rec, Dept. <br /> <br />b. POINT OF CONTACT <br />Adelfa Martinez <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT <br />SRS provided the engineering design, <br />permitting and construction phase services of <br />a pedestrian/bike path I access road, parking <br />area, and canoe ramp. The project is located <br />within Chapman Field Park from Old Cutler <br />Road to approximately 3/4 mile east into the <br />park. The work included the geometric design <br />of the pedestrian/bike paths and parking loti <br />design site paving, grading, and drainage <br />plans. Coordinating the work with other <br />subconsultants including Surveyors, <br />Geotechnical, Structural Engineers and <br />environmental consultants. Our scope of work <br />also included preparing and submitting permit <br />applications and construction plans for <br />"dry-run" and "final" review by local <br />regulatory agencies including Miami-Dade <br />County Building Department, Miami-Dade <br />Public Works Dept., and DERM; as well as, <br />Environment Resources Permit (ERP) for <br />costal construction and impacts to wetlands <br />and mangroves. <br />Construction Phase services included weekly <br />construction meetings, reviewing shop <br />drawings, responding to RFI's, providing <br />periodic construction observations, and <br />preparing close-out documents. <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />305-775-7815 <br /> <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />a, SRS Engineering, Inc. Miami, FL 33155 Program Manager, Civil Engineering <br /> & Construction <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />b, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />d, <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />e. <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />f. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.