Laserfiche WebLink
<br />12. NAME <br />John P. Kim, P .E., PTOE <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Comp/ete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Project Manager <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL I b. WITH CURRENT <br />14 FIRM 8 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br /><I,M~M.~!"!QN. McMahon Associates, Inc, - Palm Beach Gardens, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALlZA T/ON) <br />Bachelor of Science, Industrial and Systems Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br />FL - Professional Engineer <br />Professional Traffic 0 erations En ineer <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />John Kim has experience in traffic engineering and land use planning since 1996. Mr. Kim's tenure with McMahon <br />Associates has provided him with a vast amount of experience managing a myriad of projects for both private and public <br />sector clients that includes the preparation of traffic impact studies, traffic signal warrant analysis, traffic calming studies, <br />bicycle/pedestrian studies and bicycle lane design, concurrency analysis, site plan review and design, future land use <br />amendment studies and parking demand analysis. His tenure as the Section Head of the Traffic Concurrency Section with <br />the Traffic Engineering Division of Miami-Dade County included managing the Traffic Concurrency Management Program for <br />the County. His experience during this tenure includes the review of traffic impact studies, Developments of Regional Impact <br />(DRI), large and small scale future land use amendment applications and land development projects. <br /> <br />19. RELEVANT PROJECTS <br /> <br />(1) TITLE AND LOCATION (City and State) <br />City Traffic Engineer, Palm Beach Gardens, Florida <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />On-Goin <br /> <br /> <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm <br />As a traffic consultant to the City Engineer, Boyle Engineering, Inc., John Kim serves as the Traffic Engineer to the City. <br />In this capacity, he reviews site applicant traffic reports for conformance to City Concurrency Management requirements, <br />Palm Beach Count Traffic Performance Standards. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Traffic Engineer - Northern Palm Beach County Improvement <br />District, Palm Beach Count , Florida <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />On-Going <br /> <br />b. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm <br />Selected to provide general transportation engineering services to the District. The services provided, issued on a task <br />order as needed basis, include traffic operations analysis, safe sight distance assessment, speed studies, traffic calming, <br />clear zone assessment, ex ert testimon and roundabout and roadwa desi n. <br />(1) TITLE AND LOCATION (City and State) <br />Districtwide Traffic Operations & Safety Contract, <br />FDOT District Six, Miami, Florida <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2008 <br /> <br />c. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm <br />This project required Safety Studies, Qualitative Assessments, Signal Warrant Analysis, Intersection Analysis, Arterial <br />Anal sis, Left-turn Phase Warrant Anal sis, Su lemental Tasks and Fatal Crash Reviews. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Traffic Engineer, Town of Haverhill, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />On-Goin <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm <br />Provide consulting services to the Town on an as-needed basis for the review of traffic studies within or adjacent to the <br />Town's limits. Attends council meetings and provides expert testimony. In addition, he provides guidance to applicants <br />seekin a roval from the Cit , and offers ex ert testimon ,as re uired. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />Districtwide Traffic Ops Studies, Fort Lauderdale, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />On-Goin <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm <br />Manages all aspects of the task work order based contract for operational analysis and includes safety studies, qualitative <br />assessments, arterial analysis, etc. <br /> <br /> <br /> <br />F :\FL \ 1 0304K_ Su nnylslesBeach\ 1 0304K _ OP\RFQ\330\J PK.doc <br /> <br />8e <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />