Laserfiche WebLink
<br />12. NAME <br />Tony Chu, E.!. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Comp/ete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Project Engineer <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL I b. WITH CURRENT <br />12 FIRM 3 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />~.M:M.At!QN. McMahon Associates, Inc, - Palm Beach Gardens, FL <br /> <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science, Civil Engineering <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br />Engineer Intern, No. 0170002737 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) <br />Tony Chu's transportation engineering and signal design experience began in 1998. Prior to joining McMahon, Mr. Chu was <br />part of the Systems Timing Group from the North Carolina Department of Transportation. His experience includes providing <br />traffic engineering services to private and public sector clients, including traffic operational analysis, traffic impact studies, <br />Development of Regional Impact (DRI) studies, qualitative assessment studies, data collection, crash analysis intersection <br />capacity analysis, pedestrian crossing studies, traffic signal design, traffic signal warrant analysis, crash analysis and traffic <br />study review. Mr. Chu's software experience includes TSIS/CORSIM, HCS2000, Signal 2000, SYNCHRO 7, TSPPD, <br />TRANSYT-7F, FREQ, Oasis, Streetwise, AutoCAD, MicroStation, GIS ArcView, Arclnfo and ArcGIS. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Transportation Engineering/Planning Consultant, Palm Beach PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Gardens, Florida On-Going <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm <br /> Services provided to the City on an as needed basis for the review of the traffic impact analysis and site plans for land <br /> development and zoning applications. Review types include future land use amendments, Developments of Regional <br /> Impacts, master plans, parkina studies, operational analysis and site olans. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Palm Beach Post TIS, Palm Beach County, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2007 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm <br /> Performed a traffic impact analysis, to show compliance with the Palm Beach County Traffic Performance Standards, for <br /> a proposed 361,000 square foot newspaper production facility. The analysis included roadway capacity, signalized <br /> intersection capacity and arterial corridor analysis. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Traffic Management Center, City of Boca Raton, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2005 <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> Monitored various surveillance cameras on transportation facilities. Operated various Intelligent Transportation System <br /> (ITS) software packages and programs; including various diagnostic tools and databases. Collected and disseminated <br /> transportation facility data with maintenance teams, response teams, other operation centers. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Traffic Signal Design, Vero Beach, Florida PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2008 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [g] Check if project performed with current firm <br /> Due to utility conflicts, coordination with another consultant for intersection improvements on the south leg of 43rd Avenue <br /> at 8th Street warranted mast arm and pedestrian pole relocations. In addition, mast arm calculations were performed to <br /> select the appropriate mast arm length and height. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Interstate 10 Freeway Study, San Bernardino, California PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2004 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> CAL TRANS, District 8, requested a freeway study of Interstate 10 east of Interstate 215 to determine if an additional lane <br /> eastbound and westbound would reduce congestion. Various alternatives were tested to evaluate what specific impact <br /> each one would have on traffic during peak periods. <br /> <br />8e <br /> <br />STANDARD FORM 330 (1/2004) PAGE 2 <br />