|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />
<br />12. NAME
<br />
<br />13. ROLE IN THIS CONTRACT
<br />
<br />14. YEARS EXPERIENCE
<br />
<br />JUAN H. VAZQUEZ, P.E., P.H., BCEE
<br />
<br />WATER AND SEWER
<br />
<br />a. TOTAL
<br />24
<br />
<br />b. WITH CURRENT FIRM
<br />9
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />g R.J. BEHAR & COMPANY, INC.
<br />!t;J 6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />B.S., Civil Engineering, University of Puerto Rico, 1985
<br />Continuing education courses in Hydrology/Hydraulics, Bridge
<br />Scour, Everglades Restoration, Pumps Station Design and
<br />Wastewater Treatment Design.
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />State of Florida, P E . License No. 51143
<br />State of Virginia, P E - License No.0402 025604
<br />Puerto Rico, P E - License No. 11385
<br />State of Michigan, P E - License No. 46482
<br />Professional H drolo ist - License No. 05-H-1653
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Vazquez is Vice President of R.J. Behar & Company, Inc. He has over 24 years of experience in planning and design of civil engineering
<br />projects. He has also been involved in civil/drainage improvement projects throughout Florida, Puerto Rico, New York, Virginia, Arkansas, Idaho and
<br />Pennsylvania. He has also experience in water and sewer major drainage projects, hydrologic-hydraulic studies, stormwater master plans, bridge
<br />hydraulic & scour analyses, and environmental projects. He has designed sanitary and storm water pump stations, sanitary collection systems as well
<br />as water distribution systems. His modeling experience includes Hec-1, Hec-2, HEC-RAS, SPWMM, AdICPR, ASAD and others.
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />a.
<br />
<br />(1) TITLE AND LOCATION (City and State) 2 YEAR COMPLETED
<br />Northlake Boulevard Bridge over the Loxahatchee Slough PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Palm Beach Count , FL - FDOT District 4 On-going
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm
<br />Drainage Engineer responsible for the drainage design and permitting. This project is for the construction of a new bridge over the Loxahatchee
<br />Slou h. Sco e of services includes roadwa im rovements.
<br />(1) TITLE AND LOCATION (City and State)
<br />Powerline Road (SR 845) 3R Palm Beach County - FDOT District 4
<br />
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2004
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm
<br />Project Manager in charge of the 3R rehabilitation project. The project includes major culvert replacement, milling and resurfacing, 8 signals,
<br />b. brid e improvements and si nin and markin lans. Prepared maintenance of traffic plans.
<br />(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED
<br />North County Neighborhood Improvement Project - Water and Sewer - PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Broward Count , Florida On-going
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm
<br />Mr. Vazquez serves as Project Manager/Engineer of Record for this project. The scope of the project consists of providing drainage design; cost
<br />estimating of drainage system; permitting of drainage system; and peer review of: water distribution plans, sewer distribution plans, water reuse
<br />master plan, water reuse design, streets and sidewalks plans. The peer reviews are being performed at each phase of design. RJ Behar will also
<br />be providin construction mana ement and inspection services durin the construction.
<br />(1) TITLE AND LOCATION (City and State)
<br />Shady Banks Septic Tank Conversion Project
<br />Cit of Fort Lauderdale, FL
<br />
<br />c
<br />
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2006
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm
<br />d. Pro'ect Mana er/En ineer of Record for conversion of a nei hborhood from se tic tank to sanita sewer s stem.
<br />(1) TITLE AND LOCATION (City and State) 2 YEAR COMPLETED
<br />Neighborhood Improvement Projects, La Gorce, West/Bay Road Avenue PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />and Nautilus 2007
<br />Cit of Miami Beach, FL
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm
<br />Drainage Engineer. This project consisted of rehabilitation and resurfacing the Blue Heron Boulevard from Avenue S to Dixie Highway. Drainage
<br />design included review of the project history, site evaluations and development of the scope for 3R improvements.
<br />
<br />e.
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 1
<br />
|