Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />12. NAME <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />14. YEARS EXPERIENCE <br /> <br />JUAN H. VAZQUEZ, P.E., P.H., BCEE <br /> <br />WATER AND SEWER <br /> <br />a. TOTAL <br />24 <br /> <br />b. WITH CURRENT FIRM <br />9 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />g R.J. BEHAR & COMPANY, INC. <br />!t;J 6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S., Civil Engineering, University of Puerto Rico, 1985 <br />Continuing education courses in Hydrology/Hydraulics, Bridge <br />Scour, Everglades Restoration, Pumps Station Design and <br />Wastewater Treatment Design. <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />State of Florida, P E . License No. 51143 <br />State of Virginia, P E - License No.0402 025604 <br />Puerto Rico, P E - License No. 11385 <br />State of Michigan, P E - License No. 46482 <br />Professional H drolo ist - License No. 05-H-1653 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Vazquez is Vice President of R.J. Behar & Company, Inc. He has over 24 years of experience in planning and design of civil engineering <br />projects. He has also been involved in civil/drainage improvement projects throughout Florida, Puerto Rico, New York, Virginia, Arkansas, Idaho and <br />Pennsylvania. He has also experience in water and sewer major drainage projects, hydrologic-hydraulic studies, stormwater master plans, bridge <br />hydraulic & scour analyses, and environmental projects. He has designed sanitary and storm water pump stations, sanitary collection systems as well <br />as water distribution systems. His modeling experience includes Hec-1, Hec-2, HEC-RAS, SPWMM, AdICPR, ASAD and others. <br /> <br />19. RELEVANT PROJECTS <br /> <br />a. <br /> <br />(1) TITLE AND LOCATION (City and State) 2 YEAR COMPLETED <br />Northlake Boulevard Bridge over the Loxahatchee Slough PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Palm Beach Count , FL - FDOT District 4 On-going <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm <br />Drainage Engineer responsible for the drainage design and permitting. This project is for the construction of a new bridge over the Loxahatchee <br />Slou h. Sco e of services includes roadwa im rovements. <br />(1) TITLE AND LOCATION (City and State) <br />Powerline Road (SR 845) 3R Palm Beach County - FDOT District 4 <br /> <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2004 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm <br />Project Manager in charge of the 3R rehabilitation project. The project includes major culvert replacement, milling and resurfacing, 8 signals, <br />b. brid e improvements and si nin and markin lans. Prepared maintenance of traffic plans. <br />(1) TITLE AND LOCATION (City and State) (2 YEAR COMPLETED <br />North County Neighborhood Improvement Project - Water and Sewer - PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Broward Count , Florida On-going <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm <br />Mr. Vazquez serves as Project Manager/Engineer of Record for this project. The scope of the project consists of providing drainage design; cost <br />estimating of drainage system; permitting of drainage system; and peer review of: water distribution plans, sewer distribution plans, water reuse <br />master plan, water reuse design, streets and sidewalks plans. The peer reviews are being performed at each phase of design. RJ Behar will also <br />be providin construction mana ement and inspection services durin the construction. <br />(1) TITLE AND LOCATION (City and State) <br />Shady Banks Septic Tank Conversion Project <br />Cit of Fort Lauderdale, FL <br /> <br />c <br /> <br />2 YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2006 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm <br />d. Pro'ect Mana er/En ineer of Record for conversion of a nei hborhood from se tic tank to sanita sewer s stem. <br />(1) TITLE AND LOCATION (City and State) 2 YEAR COMPLETED <br />Neighborhood Improvement Projects, La Gorce, West/Bay Road Avenue PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />and Nautilus 2007 <br />Cit of Miami Beach, FL <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm <br />Drainage Engineer. This project consisted of rehabilitation and resurfacing the Blue Heron Boulevard from Avenue S to Dixie Highway. Drainage <br />design included review of the project history, site evaluations and development of the scope for 3R improvements. <br /> <br />e. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 1 <br />