My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 2:22:25 PM
Creation date
11/17/2010 2:21:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />DRAINAGE/PERMITTING <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />25 1 <br /> <br />12. NAME <br />DAVID M. BOYER, PE <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />g R.J. BEHAR & COMPANY, INC. <br />fa 6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B. S. Environmental Engineering, University of South Florida, <br />Tampa, FL - April 1985 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer # 43226 Florida <br />Professional En ineer # 34591 Washin ton <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) <br />Mr. Boyer has over 25 years of experience including expertise in storm water management and treatment system design, highway, municipal and <br />private drainage design and project management. Mr. Boyer also has an ex1ensive background in roadway drainage design and permitting projects for <br />the Florida Department of Transportation (FOOT), on multiple Interstate and Turnpike roadway widening. He also has experience in drainage design <br />on several airport projects, such as the Miami International Airport and the Fort Lauderdale-Hollywood International Airport. At RJ Behar, he is the <br />Water Resources Director. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> Roebuck Road From SR 7 to Jog Road - Palm Beach County, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Lead Drainage Engineer responsible for complete drainage design of this proposed roadway on a new alignment. The drainage design <br />a. Included storm sewer design, stormwater management ponds, and connections to adjacent subdivisions, water quality treatment system and <br />permittinq. This proiect was desiqned to 60% plans before permitting halted the proiect. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 71 O/Beeline Highway Design (East and West) - FDOT District 4 PROFESSIONAL SERVICES T CONSTRUCTION (If applicable) <br /> 2005 Current <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Senior Drainage Engineer for the design of two new construction/widening projects. The combined length of both projects is 5.33 miles. The <br /> western project consists of the addition of two new lanes to provide a four-lane divided rural roadway, along with the replacement of the existing <br /> two-lane bridge and the construction of a new two-lane parallel bridge. The eastern project consists of the new construction to provide a four-lane <br />b. divided urban roadway. Responsible for the drainage design, stormwater management, and permitting. Also obtained a water use permit for <br />irrigation from wells, and provided post construction drainage services. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> SR 80 Design West, East of Kirk Road to west of Haverhill Boulevard, West Palm PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Beach, FL - FDOT District 4 2009 Current <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Senior Drainage Engineer responsible for all drainage aspects for team providing the complex engineering design and permitting services for SR <br /> 80 from west of Haverhill Road to East of Kirk Road. The project was designed with eight lanes and a grade-separated interchange at Military Trail <br /> and Haverhill Road. Program included five bridges with retaining walls and a 2,500-foot bulkhead along the north side of the C-51 Canal. Also <br />c. ,provided post construction drainaqe services. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> SR 5/US 1 Improvement - FDOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Current <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Senior Drainage Design Engineer on this 2.9-mile road improvement project in St. Lucie County. Analysis involved exfiltration trench design, storm <br /> sewer design and analysis, cross-drain analysis, and coordination with St. Lucie County on the design of three regional stormwater ponds. <br />d. Responsible for all drainage permitting. Also provided post construction drainage services. <br /> (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED <br /> 1-595 Final Design - FDOT District 4 (AECOMlDragados) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Water Resources Director responsible for the overall drainage master plan update, complete drainage design for the entire corridor which includes <br /> exfiltration trench, storm sewer design and analysis, cross-drain analysis, and both wet and dry retention stormwater management designs for <br />e. seven out of eight design zones. He is also responsible for drainage plan preparation for two roadway design sections, as well as all coordination <br />between six different design firms. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.