|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />
<br />TRAFFIC ENGINEERING
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRM
<br />37 <1
<br />
<br />12. NAME
<br />RAFAEL DE ARAZOZA, PE, PTOE, CPM
<br />
<br />13. ROLE IN THIS CONTRACT
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />.:1 R.J. BEHAR & COMPANY, INC.
<br />W 6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />. Miami-Dade College, Miami, Florida, ASCET
<br />. Florida International University, Miami, Florida, BSCET
<br />. Florida State University/FOOT, Certified Public Manager (CPM)
<br />. Bar Universi ,Miami, Florida, Master of Arts in Pastoral Minist
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. De Arazoza has 37 years of transportation planning and traffic engineering experience. He has worked for both the private sector and
<br />governmental agencies, including FOOT and Broward County. Mr. De Arazoza has held many high level management positions throughout his
<br />career. He is also well-versed in traffic engineering design standards and procedures.
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />. P. E. Florida License No. 24487/1980
<br />. Professional Traffic Operations Engineer (PTOE)
<br />. Certified Public Manager (CPM)
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED
<br /> SR 836/SR 826 (Section 5) Plans Review - EAC Consulting (MDX) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Current
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br /> Project Manager - In charge of reviewing the complex Interchange Guide Sign plans covering aspects such as size of lettering, symbols, required
<br /> legend, sign locations, etc. to conform with the requirements of the Manual of Uniform Traffic Control Devices (MUTCD) and applicable FDOT
<br /> regulations and standards.
<br />a.
<br /> (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED
<br /> SR 874/Don Shula Expressway Ramp Connector to SW 136th Street - Project PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Development and Environment (PD&E) Study Current
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm
<br /> Project Manager - In charge of the required traffic engineering analyses and the development of major documents, such as the Interchange
<br /> Modification Report (IMR) and the Design Traffic Technical Memorandum (DTTM).
<br />b.
<br /> (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED
<br /> Transportation Planning & Traffic Engineering Consulting Services Contact, PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable)
<br /> Town of Cutler Bay, Florida Current
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
<br /> Performed work consisting of traffic engineering, traffic calming and safety studies as well as reviewing traffic impacts of proposed land
<br /> developments. Traffic engineering work included capacity/level-of-service analyses, traffic signal warrant studies, intersection and arterial studies,
<br /> safety studies, potential impacts of proposed land use developments. He successfully developed traffic calming and traffic engineering studies for
<br />c. the Town.
<br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED
<br /> Transportation Master Plan and Transportation Concurrency Management Areas PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> I (TCMAs) - City of Miami Gardens, Florida 2006
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE D Check if project performed with current firm
<br /> Complete development of the Transportation Master Plan including public involvement, analyses of existing and future conditions of the
<br /> transportation system; development of transportation improvement projects addressing not only roadways but multi-modal projects as well. He
<br /> developed an implementation plan including existing available and forecasted transportation funds. He received approval by the City Council and
<br /> the Metropolitan Planning Organization (MPO) process, developed a citywide TCMA's system as part of the concurrency management system and
<br />d. identified the needed improvements to address traffic impacts.
<br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED
<br /> District Six Planning Manager - FDOT District 6 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> 2004
<br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm
<br /> During his employment with FOOT Mr. De Arazoza held management level positions such as District Planning Manager, Assistant District Traffic
<br /> Operations Engineer and District Traffic Design Engineer among others. His responsibilities included transportation planning functions and related
<br /> programs, grow1h management, traffic operations and safety studies, traffic regulatory; roadway design, project development and public
<br />e. involvement.
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 1
<br />
|