Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />TRAFFIC ENGINEERING <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />37 <1 <br /> <br />12. NAME <br />RAFAEL DE ARAZOZA, PE, PTOE, CPM <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />.:1 R.J. BEHAR & COMPANY, INC. <br />W 6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />. Miami-Dade College, Miami, Florida, ASCET <br />. Florida International University, Miami, Florida, BSCET <br />. Florida State University/FOOT, Certified Public Manager (CPM) <br />. Bar Universi ,Miami, Florida, Master of Arts in Pastoral Minist <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. De Arazoza has 37 years of transportation planning and traffic engineering experience. He has worked for both the private sector and <br />governmental agencies, including FOOT and Broward County. Mr. De Arazoza has held many high level management positions throughout his <br />career. He is also well-versed in traffic engineering design standards and procedures. <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />. P. E. Florida License No. 24487/1980 <br />. Professional Traffic Operations Engineer (PTOE) <br />. Certified Public Manager (CPM) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED <br /> SR 836/SR 826 (Section 5) Plans Review - EAC Consulting (MDX) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Current <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Project Manager - In charge of reviewing the complex Interchange Guide Sign plans covering aspects such as size of lettering, symbols, required <br /> legend, sign locations, etc. to conform with the requirements of the Manual of Uniform Traffic Control Devices (MUTCD) and applicable FDOT <br /> regulations and standards. <br />a. <br /> (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED <br /> SR 874/Don Shula Expressway Ramp Connector to SW 136th Street - Project PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Development and Environment (PD&E) Study Current <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Project Manager - In charge of the required traffic engineering analyses and the development of major documents, such as the Interchange <br /> Modification Report (IMR) and the Design Traffic Technical Memorandum (DTTM). <br />b. <br /> (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED <br /> Transportation Planning & Traffic Engineering Consulting Services Contact, PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) <br /> Town of Cutler Bay, Florida Current <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> Performed work consisting of traffic engineering, traffic calming and safety studies as well as reviewing traffic impacts of proposed land <br /> developments. Traffic engineering work included capacity/level-of-service analyses, traffic signal warrant studies, intersection and arterial studies, <br /> safety studies, potential impacts of proposed land use developments. He successfully developed traffic calming and traffic engineering studies for <br />c. the Town. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> Transportation Master Plan and Transportation Concurrency Management Areas PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> I (TCMAs) - City of Miami Gardens, Florida 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> Complete development of the Transportation Master Plan including public involvement, analyses of existing and future conditions of the <br /> transportation system; development of transportation improvement projects addressing not only roadways but multi-modal projects as well. He <br /> developed an implementation plan including existing available and forecasted transportation funds. He received approval by the City Council and <br /> the Metropolitan Planning Organization (MPO) process, developed a citywide TCMA's system as part of the concurrency management system and <br />d. identified the needed improvements to address traffic impacts. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> District Six Planning Manager - FDOT District 6 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2004 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> During his employment with FOOT Mr. De Arazoza held management level positions such as District Planning Manager, Assistant District Traffic <br /> Operations Engineer and District Traffic Design Engineer among others. His responsibilities included transportation planning functions and related <br /> programs, grow1h management, traffic operations and safety studies, traffic regulatory; roadway design, project development and public <br />e. involvement. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 1 <br />