Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />12. NAME <br />CARLOS MAZORRA, PE <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />14. YEARS EXPERIENCE <br /> <br />ROADWAY DESIGN <br /> <br />a. TOTAL <br />22 <br /> <br />b. WITH CURRENT FIRM <br />6 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />R.J. BEHAR & COMPANY, INC. <br /> <br />riI <br /> <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B. S. Civil Engineering, University of Miami, 1983 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer! Florida #42653 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Mazorra has been the Project Engineer for the preparation of numerous, very successful highway construction plans. This included design of <br />horizontal and vertical geometry with GEOPAK software; drafting plan, profile, cross sections, traffic control and various ancillary roadway plan sheets <br />using Micro Station software; design of roadway signal plans in collaboration with traffic engineering and structural engineering personnel. He also <br />has 11 years of experience as an FOOT employee and knows the policies and needs of the FDOT from both a technical and managerial perspective, <br />and can thereby assure the success of any project. He has 22 years of experience. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> NW 44TH Street - City of Lauderdale Lakes, Florida PROFESSIONAL SERVICES -, CONSTRUCTION (If applicable <br /> 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm <br /> Project Manager Engineer - Construction of a new 4-lane median divided facility. The project includes roadway plans, drainage plans, privacy <br />a. walls plans, permittinQ, utilitv coordination, and inspection services. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Atlantic Boulevard/Rock Island Road Intersection Improvement - Broward County PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Engineering 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm <br /> Project Manager -He prepared traffic study, roadway plans, signalization plans, signage plans, drainage plans, and utility coordination for a major <br /> intersection improvement. The scope of the project included improvements to Atlantic Boulevard and Rock Island Road intersection. It consists of <br />b. the construction of a westbound left turn lane, westbound right turn lane, and dual left-turn lanes on all four legs. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Hillsboro Boulevard/Military Trail Intersection Improvement - Broward County PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Engineering 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm <br /> Project Manager - He prepared the traffic study, roadway plans, signalization plans, signage plans, drainage plans, and utility coordination for a <br /> major intersection improvement. The scope of the project included improvements to Hillsboro Boulevard (SR 810) at Military Trail intersection. <br /> Military Trail is a four-lane, urban. divided, north-south collector. There are two through lanes with double left turn lanes and an exclusive right <br /> turn lane at each approach to the intersection. Hillsboro Boulevard is six-lane, urban, divided, and arterial; with double left and exclusive right <br />c. turn lanes at each approach to the intersection. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Hollywood Boulevard/N. 28th Avenue Intersection Improvement - Broward County PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) <br /> Engineering 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm <br /> Project Manager - He prepared the traffic study, roadway plans, signalization plans, sign age plans, drainage plans and utility coordination for this <br />d. major intersection improvement. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Powerline Road (SR 845) Palm Beach County - FOOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable <br /> 2004 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [R] Check if project performed with current firm <br /> Project Engineer for signal design. The project includes milling and resurfacing 3 miles of major collector, 8 signal upgrades, safety <br />e. improvements and miscellaneous drainage improvements. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 1 <br />