Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />12. NAME <br />DAVID ROMANO, PE <br /> <br />13. ROLE IN THIS CONTRACT <br />CONSTRUCTION/PROJECT <br />MANAGEMENT <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />14 3 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />g R.J. BEHAR & COMPANY, INC. <br /> <br />!t;I 6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />M, S.1Construction Management <br /> <br />B, S.1Civil and Architectural En ineerin <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Romano is a licensed Professional Engineer with a Master of Science degree in Construction Management and has over 14 years of <br />experience specializing in the areas of Construction Engineering, Inspection, and Management (CEI&M). He has worked as a Senior Project <br />Engineer/Project Engineer on various roadway construction projects in Miami-Dade, Broward, and Palm Beach Counties for Districts 4, 6, and <br />Turnpike, with an aggregate dollar value of over $100 million. Mr. Romano is responsible for overseeing the construction operations, <br />administration, management, quality control, and monthly and final estimates (close-out package) of the projects. His knowledge includes all <br />facets of CEI responsibilities including the oversight of construction operations, administration, public relations, quality control, final estimates, and <br />claims analysis. <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />P.E. Florida License No. 63817/2006 <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Pines Boulevard (SR-820) and 1-75 (SR-93) Interchange CEI - City of Pembroke PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Pines, FUFDOT, District 4 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE IRICheck if project performed with current firm <br /> Senior Project Engineer on this ($11.2 Million) Local Agency Program (LAP) project between the City of Pembroke Pines and the Florida <br /> Department of Transportation, District 4. This is a federally funded project consisting of urbanized improvements at the 1-75 (SR-93) and Pines <br /> Boulevard (SR-820) Interchange. The project includes modifying the existing interstate overpass, entrance and exit ramps from a rural <br /> configuration to an urban configuration, as well as widening, signalization, landscaping, and access management improvements along Pines <br /> Boulevard. "No-excuse Bonus" (250K) and "Incentive/Decentive" contracting method utilized. <br />a. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> Emergency Water Main Repair - City of Pembroke Pines, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE IRI Check if project performed with current firm <br /> Senior Project Engineer of full construction management services for the emergency repair of a 16" PVC transmission water main that ruptured <br /> along Pines Boulevard, east of 145th Avenue in the City of Pembroke Pines. The project consisted of the replacement of 20 If. of a 16" PVC water <br /> main with 16" DIP retrained sleeve pipe, fire hydrant installation for flushing and testing, backfill and compaction following FOOT specifications. <br />b. <br /> (1) TITLE AND LOCATION (City and State) l2lYEAR COMPLETED <br /> SR 811 (NE 4th Avenue) from Sunrise Boulevard to South Fork of Middle River, PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Fort Lauderdale, FL - FDOT, District 4 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE IRI Check if project performed with current firm <br /> Senior Project Engineer responsible for the milling/resurfacing of NE 4th Avenue ($1.8Million); including drainage, pavement markings, <br />c. signalization, raised median, sidewalk, curb & gutter, landscapinq and irriaation. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 5 (Federal Highway) from Sunrise Boulevard to Oakland Park Boulevard, Fort PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Lauderdale, FL - FDOT, District 4 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE IRI Check if project performed with current firm <br /> Senior Project Engineer responsible for the milling/resurfacing and widening of Federal Highway ($7.7 Million); including reconstruction of 13th <br /> street, repairs to the Middle River Canal Bridge, drainage, pavement markings, traffic separator, raised median, signalization, utility relocation, <br /> sidewalk, curb & gutter, bus pads, landscaping, and irrigation. "No-excuse Bonus" (310K) with an "Incentive -Decentive" contracting method <br /> utilized. <br />d. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 1 <br />