Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />12. NAME <br />ANTHONY V. ALFRED, PE <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />14. YEARS EXPERIENCE <br /> <br />ROADWAY DESIGN <br /> <br />a. TOTAL <br />18 <br /> <br />b. WITH CURRENT FIRM <br />4 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />g R.J. BEHAR & COMPANY, INC. <br />!fI 6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S., Civil Engineer, Florida International University, 1991 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer/ Florida #51857 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Alfred has ex1ensive experience in transportation design engineering. He is well-versed with the FDOT design and plans preparation process. He <br />has participated in public involvement, and utility coordination process for FOOT projects. He proficiently uses and trains staff on how to use <br />Microstation V 8 /GEOPAK running the FOOT Site-Menu. He is certified in maintenance of traffic plans preparation for FOOT. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> SW 328 Street From SW 152 Ave. to SW 137 Ave. - Miami-Dade County Public PROFESSIONAL SERVICES T CONSTRUCTION (If applicable) <br /> Works On-going <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Mr. Alfred served as Senior Project Engineer. The scope of the project included master planning and feasibility analysis for the new roadway. <br /> This project involved the upgrading of the existing traffic signals to mast-arms and internally illuminated signs. The design phase for this project <br />a. comprised of drainage, lighting, signalization, signing and pavement markings. <br /> (1) TITLE AND LOCATION (City and State) . 12\ YEAR COMPLETED <br /> Hillsboro Boulevard/Military Trail Intersection Improvement - Broward County PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Engineering 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> Mr. Alfred served as project engineer. Prepared roadway plans, signing and pavement marking plans, drainage plans, and utility coordination for <br />b. this major intersection improvement project. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Downtown Miami Storm Sewer Project (North Bayshore Drive) - City of Miami, PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) <br /> Florida 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br /> The project consisted of a total reconstruction of the roadway, and the design and implementation of a drainage system, which included the <br /> replacement of the subsurface drainage system. Also as a part of the stormwater management system drainage wells were utilized to assist in <br /> alleviating flooding. The project required drainage calculations for approval from Miami-Dade County Department of Environmental Management <br /> (DERM). Mr. Alfred served as quality control engineer. <br />c. <br /> (1) TITLE AND LOCATION (City and State) /2\ YEAR COMPLETED <br /> Miami River Greenways, Segment D - City of Miami, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> On-aoina <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> Project Manager - The project consists of the reconstruction of an existing roadway segment along the Miami River to produce a <br /> scenic, landscaped, pedestrian/bicycle walkway/greenway. The project includes the design of a drainage system with wells, <br />d. decorative lighting and landscape/hardscape design. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> SR-50 Roadway Rehabilitation, Vero Beach, FL - FOOT, District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE D Check if project performed with current firm <br /> Project Engineer/Utility Manager - He prepared all engineering plans phase submittals for a 1 mile section of a 6-lane divided urban arterial <br /> roadway, which included roadway plans, typical sections, drainage plans, traffic control plans, signing/marking plans and a computation booklet. <br /> He functioned as the utility manager and prepared the resurfacing, restoration and rehabilitation report. <br />e. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 1 <br />