Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />ROADWAY DESIGN <br /> <br />a. TOTAL <br />5 <br /> <br />14. YEARS EXPERIENCE <br />b. WITH CURRENT FIRM <br />5 <br /> <br />12. NAME <br />HANS RIBBECK, PE <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />g R.J. BEHAR & COMPANY, INC. <br />!Ell 6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S., Civil Engineering, Florida International University, 2005 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />2006/ En ineer Intern/No. 1100011055/ Florida <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />At RJ Behar, Mr. Ribbeck is a Project Engineer in charge of design and plans preparation of roadway projects, drainage plans, signing and pavement <br />marking plans, signalization plans, and permitting package. He has five years of experience. <br /> <br />CONTINUING EDUCATION <br />2007 FOOT Advanced Geopack for Roadway Designers <br />2006 FOOT Basic Geopack for Roadway Designers <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) l2\YEAR COMPLETED <br /> SW 176TH from SW 107TH Avenue to US 1, Miami, Florida - Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> County Public Work 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm <br /> Project Engineer - He prepared the roadway plans. The scope includes reconstruction of SW 176th from SW 107th Avenue to US 1 in Miami, <br />a. Florida. The project includes roadway plans, drainaoe, traffic, and sionino and markino plans. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Atlantic Avenue (SR 806) - FDOT District 4 PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm <br /> The scope of this project consists of complete design of resurfacing 2.8 miles of a major arterial roadway, including drainage improvements, <br /> pavement marking and signing, lighting plans, eight signal locations, public involvement program and landscape improvements. Mr. Ribbeck <br />b. served as project engineer in charge of preparation of roadway plans, signing plans drainage, signal plans, utility coordination and permitting. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Buena Vista Heights - City of Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm <br /> Project Engineer for the design and production of roadway, drainage, signing and pavement marking plans and the permit package. <br />c. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Downtown Miami Storm Sewer Project (North Bayshore Drive) - City of PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Miami, Florida 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm <br /> Project Engineer. He prepared roadway plans, pavement, and marking & signing plans. The project consisted of a total reconstruction of the <br /> roadway, and the design and implementation of a drainage system which included the replacement of the subsurface drainage system. Also, as <br />d. a part of the stormwater management system, drainage wells were utilized to assist in alleviating flooding. The project required drainage <br />calculations for approval from Miami-Dade County Department of Environmental Manaoement (DERM). <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Military Trail at Hillsboro Avenue Improvements - Broward County PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Engineering 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE [RJ Check if project performed with current firm <br /> Project Engineer for the preparation of roadway plans for milling and resurfacing and median safety improvements. The scope of the projec <br /> included improvements to Hillsboro Boulevard (SR 810) at Military Trail intersection. Military Trail is a four-lane, urban, divided, north-sout~ <br /> collector. There are two through lanes with double left turn lanes and an exclusive right turn lane at each approach to the intersection. Hillsborc <br />e. Boulevard is a six-lane, urban, divided, and arterial; with double left and exclusive right turn lanes at each approach to the intersection. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 1 <br />