Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />12. NAME <br />FERNANDO CANO, PE <br /> <br />13. ROLE IN THIS CONTRACT <br />DRAINAGE/PERMITTING <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />5 1 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />I) R.J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />B. S. Civil Engineering, University of Florida, Engineer Intern, Florida License No. 1100008957, <br />Gainesville, Florida December 2003 Feb 21, 2004 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />At RJ Behar, Mr. Cano works in the Water Resources Group and his responsibilities include design and modeling of drainage, water distribution and <br />sewer projects. He is also involved in highway drainage projects. <br /> <br />ACTIVITIES AND ACHIEVEMENTS <br />PSMJ Project Management Boot Camp I Training <br />ICPR Training Seminar <br />Haestad Methods - Water Distribution Modeling <br />FOEP Stormwater Management Inspector <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 1.595 Final Design - FDOT District 4 (AECOM/Dragados) PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Current <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [BJ Check if project performed with current firm <br /> Project Engineer - Design tasks include exfiltration trench design, storm sewer design and analysis and both wet and dry retention stormwater <br /> management pond designs. The design involved the use of spreadsheets, ICPR, ASAD and Microstation. <br />a. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Immokalee Master Drainage Study - City of Immokalee, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> Project Engineer. The project consisted of analyzing the existing hydraulic conditions and proposed build-out conditions of a 600 acre site <br /> consisting of commercial and residential development. The Interconnected Channel and Pond Routing (I CPR) program was used to model the <br /> Seminole Tribe Immokalee Reservation Drainage Basin located in the City of Immokalee, Collier County, Florida. Aerials, existing topographic <br /> surveys, existing engineering plans, field observations, water table elevations, as-built information and the proposed Immokalee Master Site Plan <br /> were compiled to establish design guidelines for the overall surface water management system to set minimum road crown elevations, finish floor <br />b. elevations and water storage requirements for the Seminole Tribe of Florida Immokalee Reservation Basin. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Kings Garden I & II Livable Neighborhood Improvements Project PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> (CMGLNIP) - City of Miami Gardens, FL <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE Check if project performed with current firm <br /> Project Engineer. This project consists of drainage improvements to an existing neighborhood of approximately 17 -acres as outlined in the Basis <br /> of Design Report. The project required permitting with Miami Dade Department of Environmental Resources Management. <br />c. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 1 <br />