Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />12. NAME <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />14. YEARS EXPERIENCE <br /> <br />CARMEN APONTE, MS, CEI <br /> <br />DRAINAGE/PERMITTING <br /> <br />a. TOTAL <br />14 <br /> <br />b. WITH CURRENT FIRM <br />7 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />riI R.J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Bachelor of Science in Industrial Engineering/Food Engineering/ <br />Universidad INCCA de Colombia. Bogota, Colombia, 1991 <br />Master of Science in Environmental Engineering, - April 2000 <br />Florida International Universit FlU Miami, Florida <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />At R.J. Behar, Ms. Aponte works on environmental and water resources projects. She provides support with hydrologic/hydraulic and water quality <br />modeling. She also has significant experience with Phase I and II environmental assessments and pollution mitigation. She is familiar with modeling <br />software WanView, AdICPR, and Modflow. She is also proficient in GIS applications software. <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Certified Environmental Inspector (CEI) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> NW 7th/9th Avenue Connector (PD&E) Study - City of Fort Lauderdale, Broward PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> County I FDOT District 4 Current <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm <br /> Project Engineer - Responsible for the re-evaluation of the contamination screening and evaluation report in accordance with FDOT/PD&E 23 <br /> CFR 771. The re-evaluation identifies significant environmental impacts, which may have changed after previous environmental reports. <br />a. Conclusions and recommendations are also provided in order to continue to the nex1 project phase or Phase II of the Environmental Assessment <br />before project execution. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> NW 87th Avenue, Miami-Dade County - FDOT District 6 PROFESSIONAL SERVICES TCONSTRUCTION (If applicable) <br /> Current <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm <br />b. Ms. Aponte developed the drainage design including French drains and performed basin evaluation and calculations using AdlCPR and the <br />ASAD models. <br /> (1) TITLE AND LOCATION (City and State) l2lYEAR COMPLETED <br /> North Broward County Neighborhood Improvement - Broward County Water & PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Sewer Current <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm <br /> Ms. Aponte is in charge of the design and proposed installation of a comprehensive storm water management system in a portion of the North <br /> Broward County Neighborhood Improvement Project (NCNIP). This project includes assessment the existing drainage system identifying <br />c. problem areas and offerino the most suitable solution for existino flood problem. <br /> (1) TITLE AND LOCATION (City and State) (2\ YEAR COMPLETED <br /> NW 107th Avenue Feasibility Study - Miami-Dade County PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2005 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm <br /> The purpose of the study was to provide an evaluation of feasibility for extending the NW 1 07th Avenue corridor from the northern terminus at NW <br />d. 138th Street to NW 106th Street Ms. Aponte performed the analysis and evaluation of existing environmental conditions and provided <br />recommendations for mitigation where applicable. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> NW 44th Street - City of Lauderdale Lakes, Florida PROFESSIONAL SERVICES TCONSTRUCTION (If applicable) <br /> 2005 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm <br /> Drainage Engineer - She designed the drainage system for the roadway including pre vs. post analysis using Ad ICPR, storm sewer design, <br /> spread calculations, water quality ditch design with weir control, culvert life estimation, and prepared the drainage report. Also prepared the <br />e. Environmental Resource Permit Packaoe. <br /> (1) TITLE AND LOCATION (City and State) 12\ YEAR COMPLETED <br /> NW 5th Street Bridge Replacement - FOOT, District 6 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm <br />f. Drainage Engineer for drainage design using French drains. This project includes major utility coordination, permitting package and large offsite <br />areas discharging throuoh the project <br /> <br />STANDARD FORM 330 (1/2004) PAGE 1 <br />