Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />12. NAME <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />14. YEARS EXPERIENCE <br /> <br />SANDRA SEQUEIRA, M.S., E.I. <br /> <br />WATER & SEWER/CIVIL & SITE <br />ENGINEERING <br /> <br />a. TOTAL <br />9 <br /> <br />b. WITH CURRENT FIRM <br />2 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />R.J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />M.S. / 2001/ Civil and Environmental Engineering - University of <br />Washington, Seattle <br />B.S. /1995/ Civil Engineer, Universidad Nacional de Ingenieria, <br />Mana ua, Nicara ua <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Ms. Sequeira is a civil engineer with nine years of experience in civil engineering, drainage design and construction management. Her graduate <br />degree has provided her with the skills required for civil and environmental engineering. <br /> <br />JiI <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Engineer Intern Florida, August 2007 <br />License No. 1100011787 <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 1-595 Final Design PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> FDOT, District 4 (AECOMlDragados) On-going <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE l&I Check if project performed with current firm <br /> Project Engineer involved with drainage design for several sections of the corridor. Design tasks include exfiltration trench design, storm sewer <br /> design and analysis, and both wet and dry retention stormwater management pond designs. The design involves the use of spreadsheets, ICPR, <br />a. ASAD and Microstation <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Water and Sewer Improvements UAZ 303-Broward County Water & Sewer PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Chen & Associates On-going <br /> (3) BRIEF DESCRIPTION (Brief scope size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project Engineer responsible for the preparation of the construction documents and the permitting process with the agencies having jurisdiction. <br /> The civil engineering services for this project include 8" and 12" water mains and 16" transmission line, updating design as well as design of new <br />b. I C!ravity sewer system, coordination of the utilities and the provision of the new service and evaluation of the existinC! public lift stations. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SW 328 Street from SW 152 Avenue to SW 137 Avenue PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Miami-Dade County Public Works On-going <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE l&I Check if project performed with current firm <br /> Project Engineer responsible for the preparation of the storm drainage construction documents and drainage report. She is in charge of the <br /> stormwater design services required for the new drainage system through the use of exfiltration trenches, catch basins, manholes and swale <br />c. adjacent to the road. The analysis of the proposed drainage condition was done with ICPR. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> North County Neighborhood Improvement Project PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Broward County, FL 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope size. cost. etc.) AND SPECIFIC ROLE l&I Check if project performed with current firm <br /> Project Engineer in charge of drainage design and permitting. The scope of the project consisted of providing drainage design; cost estimating of <br /> drainage system; permitting of drainage system; and peer review of: water distribution plans, sewer distribution plans, water reuse master plan, <br /> water reuse design, streets and sidewalks plans. The peer reviews were performed at each phase of design. RJ Behar will also provide <br />d. construction management and inspection services during the construction. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> C-1 Basin Masterplan PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Miami-Dade County DERM 2002 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> This project encompasses seven canals covering an area of 188 square miles including 53,000 acre-feet pf agricultural and urban runoff. The <br /> developed master plan will propose to identify the main water quantity and quality problems and will introduce strategic measures for mitigating <br /> such problems. She provided civil engineering services required for the development of the South Miami-Dade County watershed also known as <br /> the C-1 Basin. The purpose of the project was to develop a corrective plan for the management and treatment of storm water runoff including <br />e. replacement and rehabilitation of storm water outfalls. <br /> <br />STANDARD FORM 330 (112004) PAGE 1 <br />