Laserfiche WebLink
<br />I <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />12. NAME <br />NANETTE AKYAZ <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />14. YEARS EXPERIENCE <br /> <br />ROADWAY DESIGN <br /> <br />a. <br /> <br />TOTAL <br />12 <br /> <br />b. WITH CURRENT FIRM <br />8 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />R.J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />Current / Civil Engineering Program / F.I.U. Davie Campus Florida <br />A.A. Degree / 1992 / Broward Community College Graduated with <br />Highest Honors <br /> <br />fi) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />N/A <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />At RJ Behar, Ms. Akyaz is responsible for plans preparation in both MicroStation and AutoCAD for civil and roadway projects. She also provides <br />support on civil engineering projects. Ms. Akyaz has been responsible for preparation of roadway plans for many projects throughout South Florida. <br />Her responsibilities included the preparation of plans using MicroStation. She drafted and performed revisions to site, utility, drainage, and structural <br />plans. <br />PROFESSIONAL TRAINING <br />2002 FOOT CAD Update Training Seminar <br />2002 FOOT PPM Design Update Training <br /> <br />Florida International University - AutoCAD Release 12 <br />FOOT / FICE - Load and Resistance Factor Design (LRFO) Training <br />Geopak Road Hraining <br /> <br />19. RELEVANT PROJECTS <br /> <br />a. <br /> <br /> <br />(1) TITLE AND LOCATION (City and State) <br />1-751 Griffin Road Interchange - FOOT District 4 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE <br />b. Technician - She prepared t pical section packa e and qualit control review. <br />(1) TITLE AND LOCATION (City and State) <br />Milander Park Streetscape - City of Hialeah, Florida <br /> <br />(2) YEAR COMPLETED <br /> <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2007 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~Check if project performed with current firm. <br />c. CAD Technician - She repared master plans for East 47th and East 48th Street from Palm Avenue to East 1st Avenue. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />US 1/SR 5 - St. Lucie County, FL - FOOT, District 4 PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2004 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Preparation of signalization plans. RJ Behar's scope was the drainage design and signalization upgrades. Drainage design included review of the <br />d. roject histo site evaluations and development of the scope for 3R improvements. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />E. 6th Ave. (From E. 9th Street to Hialeah Drive), E. 5th Street (from E. 4th Avenue to PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />E. 6th Ave.), E. 5th Street (From E. 6th Ave. to E. 8th Ave.) - City of Hialeah, Florida 2004 <br /> <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Reconstruction of 2.0 miles of a 3-lane urban road for the city of Hialeah following FDOT's and Miami-Dade County's standards (2000). <br />Responsible for the drafting of roadway plans, drainage, traffic control, signalization, utility relocation, as well as the design and drafting of signing <br />e. and markin s lans and Ii htin includin Ii htin calculations. <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2003 <br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE ~ Check if project performed with current firm <br />Prepared roadway plans, drainage design, signing and marking, signal plans, conversion of overhead to underground utilities. The project <br />f. consisted of the reconstruction of 1.6-miles of cit street, conversion from one wa to two-wa traffic. <br />STANDARD FORM 330 (1/2004) PAGE 1 <br /> <br />(1) TITLE AND LOCATION (City and State) <br />E, 15t Avenue - City of Hialeah, Florida <br />