My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 2:22:25 PM
Creation date
11/17/2010 2:21:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />WATER/SEWER <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />3 3 <br /> <br />12. NAME <br />SUGEIL Y PATXOT <br /> <br />13. ROLE IN THIS CONTRACT <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />II:::) R.J. BEHAR & COMPANY, INC. <br />!f;;;I 6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S. Civil Engineer, University of Puerto Rico, 2007 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />N1A <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />At RJ Behar, Ms. Patxot is responsible for plans preparation and drainage calculations. She also assists in the preparation of drawings for proposals, <br />boards and reports. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 1-595 Final Design - FDOT, District 4 (AECOM /Dragados) PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> On-going <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE OOCheck if project performed with current firm <br /> Project Engineer involved with developing the drainage master plan update, and assisted with the drainage design for several sections of the <br /> corridor. Design tasks include exfiltration trench design, storm sewer design and analysis, and both wet and dry retention stormwater <br />a. management pond designs. The design involved the use of spreadsheets, ICPR, ASAD and Microstation. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Structure Inspection Program (SIP) Non-Sta Structures - South Florida Water PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Management District 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE OOCheck if project performed with current firm <br /> Project Engineer - She coordinated the preparation of deliverables with the inspectors. She followed up with QC comments as well client <br />b. comments, and prepared tracking charts for all deliverables. She worked on the preparation of all the inspection reports in coordination with the <br />inspection team. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR A 1 A Palm Beach County - FDOT, District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost. etc.) AND SPECIFIC ROLE OOCheck if project performed with current firm <br /> Project Engineer - The scope consisted of roadway improvements along SR A 1 A from Boynton Inlet Bridge to Lake Worth Road. The project <br /> included a major drainage study and improvements, milling and resurfacing, signals bridge improvements and signing and marking plans. Ms. <br /> Patxot performed plan revisions during post design services. <br />c <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> C-4 Canal Flood Protection Belen Section - South Florida Water Management PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> District 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE OOCheck if project performed with current firm <br /> Project Engineer in charge of plans preparation for design of a f100dwall for flood protection of the area of Belen in Miami-Dade. <br />d. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> North County Neighborhood Improvement Project - Broward County, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE OOCheck if project performed with current firm <br /> Project Engineer - This project consisted of drainage design, construction management and peer review. Ms. Patxot was in charge of the plans <br /> preparation, drainage and quantity calculations. <br />e. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Hollywood Boulevard/SR 820 (US-' to SR A 1 A) - FDOT, District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> On-going <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE OOCheck if project performed with current firm <br /> Project Engineer in charge of plans preparation. She assisted with the drainage calculations and report preparation. <br />f. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.