My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R.J. Behar & Co.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
R.J. Behar & Co.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 2:22:25 PM
Creation date
11/17/2010 2:21:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person) <br /> <br />12. NAME <br />MARLIN SCATTOLlNI <br /> <br />13. ROLE IN THIS CONTRACT <br />CIVIUSITE ENGINEERING <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />3 3 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />II R.J. BEHAR & COMPANY, INC. <br />6861 SW 196th Avenue, Suite 302 <br />Pembroke Pines, FL 33332 <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B. S. Civil Engineering Florida International University 2006 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />N/A <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />At RJ Behar, Ms. Scat10lini is in charge of design and plans preparation of roadway projects, drainage plans, signing and pavement marking plans, <br />signalization plans, and permit1ing package. She has 3 years of experience. <br />ACTIVITIES AND ACHIEVEMENTS <br />Golden Key Honor Society, Institute of Transportation Engineering (ITE) <br />ASCE American Society of Civil Engineers. <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Powerline Road (SR 845) Palm Beach County - FDOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm <br />a. Project Engineer - She prepared the signing and pavement marking plans, 3R reports, plan preparation, utility coordination, pavement design and <br />quantities. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SW 328th Street from SW 152nd Avenue to SW 137th Avenue - Miami-Dade County PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Public Works Current <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm <br /> Project Engineer - She prepared the signing and pavement marking plans. The scope of the project included master planning and feasibility <br /> analysis for the new roadway. This project involved the upgrading of the existing traffic signals to mast-arms and internally illuminated signs. The <br />b. design phase for this project comprised of drainage, lighting, signalization, signing and pavement markings. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Hialeah High School Parking Garage - Civil Plans - City of Hialeah, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm <br /> Project Engineer for civil site improvements for this parking garage. Her responsibilities included water and sewer layout, signing and pavement <br /> marking and drainage layout. <br />c. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> E. 1st Avenue, E. 47th Street, E. 48th Street Reconstruction - City of Hialeah, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Current <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm <br />d. Project Engineer in charge of the design and production of roadway, drainage & signing and pavement marking plans. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 806 (Atlantic Avenue) Palm Beach County - FDOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm <br /> Project Engineer - She prepared the signing plans. <br />e. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR5 (US 1/ S. Federal Highway) Broward / Palm Beach Counties - FDOT District 4 PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Current <br /> (3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE [8J Check if project performed with current firm <br />f. Project Engineer - She prepared the signing plans. <br /> <br />STANDARD FORM 330 (1/2004) PAGE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.