|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />(Complete one Section E for each key person)
<br />
<br />CAD DESIGNER
<br />
<br />a. TOTAL
<br />20
<br />
<br />14. YEARS EXPERIENCE
<br />b. WITH CURRENT FIRM
<br />1
<br />
<br />12. NAME
<br />HERNANDO SEGURA
<br />
<br />13. ROLE IN THIS CONTRACT
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />g R.J. BEHAR & COMPANY, INC.
<br />!fI 6861 SW 196th Avenue, Suite 302
<br />Pembroke Pines, FL 33332
<br />16. EDUCATION (DEGREE AND SPECIALIZATION)
<br />- Mechanical and Architecture Drafting, LACC, Los Angeles, CA
<br />1983-1985
<br />-Industrial Design
<br />University Jorje Tadeo Lozano, Bogota Colombia 1979-1980
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />N/A
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Segura has over twenty years of experience in civil engineering, survey and mapping projects throughout California and Florida. He is also
<br />experienced in municipal land development (commercial and residential) and roadway projects using CAL TRANS and FDOT standards. At RJ Behar,
<br />Mr. Segura produces complete design of construction plans on all types of civil engineering projects.
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />(1) TITLE AND LOCATION (City and State)
<br />1-595 Final Design - FDOT, District 4 (AECOMlDragados)
<br />
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Current
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE lIDCheck if project performed with current firm
<br />CAD Operator - He is updating sediment structure details for Arrowhead and Pine Island Outfalls; including updating plans, cross-sections and
<br />draina e Maps for Zone 4 and Zone 6.
<br />(1) TITLE AND LOCATION (City and State) 2 YEAR COMPLETED
<br />Congress Avenue and Park Avenue Intersection Improvement - Palm Beach PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />County, FL Current
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE lIDCheck if project performed with current firm
<br />CAD 0 erator - He is res on sible for re arin roadwa lans for this intersection im rovement in Palm Beach Coun .
<br />(1) TITLE AND LOCATION (City and State) 2 YEAR COMPLETED
<br />SE 3rd Street Roadway Reconstruction, from SE Avenue G to Martin Luther King PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />Boulevard - FDOT, District Current
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE lIDCheck if project performed with current firm
<br />CAD Operator - This is a road reconstruction project (0.03 mile) in West Palm Beach County. He is involved in the preparation of plans, including
<br />roadway, drainage, lighting and pavement markings. He also prepared the plans and profiles for a new 8" water main and 8" PVC sewer line.
<br />These plans were used for quantit take outs for final construction cost.
<br />(1) TITLE AND LOCATION (City and State)
<br />Eller Drive Overpass ICTF (US 1 to Mcintosh Road) Fort Lauderdale, FL - FDOT,
<br />District 4
<br />
<br />(2) YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2009
<br />
<br />a.
<br />
<br />b.
<br />
<br />c
<br />
<br />d.
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE DCheck if project performed with current firm
<br />CAD Operator for the new $68 million Eller Drive ICTF Overpass Interchange with bridge improvements for the FOOT, District 4. This roadway is
<br />vital to Broward County and is part of the Strategic Intermodal System (SIS) connecting 1-595 to Port Everglades. The roadway also provides a
<br />direct connection to the Port from Fort Lauderdale-HolI ood International Airport.
<br />(1) TITLE AND LOCATION (City and State)
<br />SR 84, Collier County, FL - FDOT, District 1
<br />
<br />2 YEAR COMPLETED
<br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2009
<br />
<br />e.
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE DCheck if project performed with current firm
<br />CAD Operator for the milling and resurfacing of 4 miles of an urban roadway section. The scope of services included development of typical
<br />sections, avement desi n, 3R re ort, communit awareness, roadwa plans, computation books, LRE and Tran* ort.
<br />(1) TITLE AND LOCATION (City and State) 2 YEAR COMPLETED
<br />1-595 Reconstruction - Fort Lauderdale, FL PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />2008
<br />
<br />(3) BRIEF DESCRIPTION (Brief scope size, cost, etc.) AND SPECIFIC ROLE DCheck if project performed with current firm
<br />CAD Operator who collected the existing sings data, 10 miles in length on 1-595 and side streets. The data was used for pavement markings
<br />sheets in Broward Count , FL
<br />
<br />f.
<br />
<br />STANDARD FORM 330 (1/2004) PAGE 2
<br />
|