Laserfiche WebLink
<br /> <br /> <br />..... <br /> <br />. .. <br /> <br />Rudy M. Ortiz, P.E., CEO <br /> <br />-. - . -- <br /> <br />13. ROLE IN THIS CONTRACT <br />Principal-in-Charge <br /> <br />. - . <br /> <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />CES Consultants, Inc. - Miami, FL (Headquarters) <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br />B.S., (Civil Engineering) 1983; University of New York <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer <br />Florida No. 52515 <br />New York No. 071607 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Ortiz has over 25 years of design and management experience in a variety of civil engineering areas, <br />specializing in the design and construction management of neighborhood improvement projects, and <br />water/wastewater facilities. Mr. Ortiz's experience also includes Program Management of fast-track and <br />complex water and wastewater projects, including Consent Decree programs for Miami-Dade County and <br />Puerto Rico. With the City of New York, Mr. Ortiz functioned as Construction Manager, Resident Engineer and <br />Field Engineer, for a variety of multi-million dollar roadway reconstruction and neighborhood improvement <br />projects. <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Fort Lauderdale Water Works 2011Water, Sewer. Stormwater and PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Force Main, Fort Lauderdale FL Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( X J Check if project performed with current firm <br />a. Mr. Ortiz served as project principal for the firm responsible for providing construction administration and oversight for the <br /> installation of various infrastructure improvements. CES staff are placed on a full time basis to observe several work crews in <br /> various stages of completion. We then produce daily reports that the client can use towards payment requisition verification, <br /> schedule compliance, work site safety, and verification of construction adhering to the design specifications. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> East Miramar Redevelopment Transmission & Distribution Water PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Main Improvements Phase III, Miramar, FL 2009 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ( X J Check if project performed with current firm <br /> Mr. Ortiz provided services in monitoring the design of approximately 72,000 L.F. of 6-inch water main and services for the <br /> City of Miramar, including a directionally drilled 8-inch Ductile Iron Pipe section of 120 L.F. The functionality of the design is for <br /> improved fire protection throuqhout the neiqhborhoods, which currently has 2-inch and 4-inch water mains, <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> FEMA-DORM Flood Reduction Program, Miami-Dade County, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2006 <br />c. (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE ( X] Check if project performed with current firm <br />Mr. Ortiz served as project principal for the firm, responsible for design and construction oversight of roadway improvements <br /> as part of the County's flood reduction program. Mr. Ortiz responsibilities included planning, design review and cost estimate <br /> preparation for the design of French drainage, roadway resurfacing and reconstruction. Mr. Ortiz also provided quality <br /> assurance services for the firm durinq implementation of similar proiects desiqned by others, but supervised bv CES. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SW 2th Ave from US-1 to Bayshore Drive, Miami Dade County, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE ( X) Check if project performed with current firm <br />d. Mr. Ortiz as Project Principal is currently responsible for the engineering analysis and design services for a closed storm water <br />drainage system along SW 27'h Avenue between South Dixie Highway and South Bayshore Drive. The project consists of <br /> widening this stretch of roadway measuring approximately 0.75 miles. Some of the design issues encountered are the <br /> elevation changes throughout the stretch of roadway and the amount of utilities located throughout this older corridor. The <br /> team has worked diligently to provide a technically sound and cost effective design that incorporates all of the client's <br /> requirements and needs. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami-Dade County Waste Water Master Plan, Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> County Water & Sewer Department, FL 2007 <br />e. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm <br /> Mr. Ortiz as Project Principal is currently responsible for the development of Remedial Action Plans for approximately 350 <br /> Pump Stations. The Remedial Action Plans will help upgrade each individual pump station and make them compliant with the <br /> 1 O-Hr operatinq criteria. <br /> <br />19. RELEVANT PROJECTS <br /> <br />STANDARD FORM 330 (ty.Z004) PAGE 1 <br />