|
<br />12. NAME
<br />Luis A. Olivares, P.E.
<br />
<br />
<br />.
<br />13. ROLE IN THIS CONTRACT
<br />Director of Engineering
<br />
<br />28
<br />
<br /><1
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CES Consultants, Inc., Miami Lakes, Florida (Headquarters)
<br />16. EDUCATION (DEGREE AND SPECIALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />B.S., Civil Engineering Professional Engineer
<br />Tulane University, 1982 Florida - No. 49708
<br />
<br />Texas - No. 64180
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Mr. Olivares is the Director of Engineering of CES and personally manages many of the firm's engineering
<br />assignments. He has over 25 years of experience as a Civil Engineer, and has been working on major
<br />assignments for the Florida Department of Transportation, Miami-Dade Expressway Authority, Miami-Dade
<br />County Public Works; Water and Sewer; Aviation and Seaport Departments, Miami-Dade and Broward
<br />County Public Schools, United State Postal Service, City of Miami and other local cities and municipalities,
<br />managing assignments involving major transportation projects, utilities relocation, roadway reconstruction
<br />and right-of-way improvement.
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> City of Miami Miscellaneous Civil Engineering Services, Miami, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />a. Florida
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br /> Served as Project Manager for a continuing miscellaneous engineering services contract
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SW 2nd Avenue Bascule Bridge, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br /> Project Engineer responsible for the supervision of the drainage design of the bridge and approaches pump system installation
<br /> on both ends of the bridge. The project was a new four-lane bridge with a total span of 300 ft. consisting of two 3,OOO-ton
<br /> bascule leaves. It is the third longest drawbridae in the U.S. and the fourth longest in the world.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Coconut Grove Drainage Design Improvements, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br />C. Project Manager in charge of the evaluation of both the design and the physical inspection of the existing storm drainage
<br /> collection system within the 28 acres in the City of Miami. The study evaluated the failed drainage system and confirmed
<br /> eyewitness reports of flooding and provided cost effective repairs and upgrade to the existing system. We prepared the first
<br /> phase improvements to the drainage by designing an exfiltration trench system that will capture and maintain a two-year storm
<br /> event and allow the City to place an emerqencv Duma station and draw down future flood events.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Fairhaven I Bayshore Drive Neighborhood Improvements, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Coconut Grove, Florida
<br />d. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.j AND SPECIFIC ROLE [ ) Check if projecl performed wilh current firm
<br /> Project Manager responsible for the roadway reconstruction, drainage improvements, new in-fill landscape, irrigation, and
<br /> roadway lighting. Among the special challenges of the project were the utility coordination and preservation of the existing
<br /> landscaoe as well as minimizing the impacts to the existina decorative driveways throuQh coordination with the communitv.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> County Wide Drainage Improvement Construction Inspection PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Services, Miami Dade County, (Miami Dade County Public Works
<br />e. Department)
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm
<br /> Construction Project Manager for the countywide GOB construction inspection project. Duties include supervising field
<br /> inspectors for the site inspection; corresponding and coordination with the county project managers on various drainage
<br /> construction sites for iob progress, inspection schedule and inspector availability
<br />
<br />19. RELEVANT PROJECTS
<br />
<br />STANDARD FORM 330 (&'2004) PAGE 1
<br />
|