|
<br />~E" RESUM~S~OF KEY"r~,R~ONNEL ~~~~,p.~E~>FO~JH~S C-~
<br />_~';h~~~rbt.: .Jti$~~(Complete one Section E for each'key person.') . ,
<br />
<br />12. NAME
<br />Werner J. Reinefeld, P.E.
<br />
<br />13, ROLE IN THIS CONTRACT
<br />Design Engineer
<br />
<br />14. YEARS EXPERIENCE
<br />a. TOTAL b. WITH CURRENT FIRM
<br />26 <1
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />CES Consultants, Inc. - Miami, FL (Headquarters)
<br />16. EDUCATION (DEGREE AND SPECIALlZA nON)
<br />BS, Civil Engineering
<br />Central University of Venezuela, 1983
<br />
<br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE)
<br />Professional Engineer
<br />Florida No. 63042
<br />
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Replacement of the 54-inch Force Main from the CDWWTP to PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Miami Beach (Government Cut) 2010 N/A
<br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I ] Check if project performed with current firm
<br /> Mr. Reinefeld was responsible in developing and coordinating with MDWASD the Master Specifications Volume for the
<br /> Design-Build Package. Duties included developing of separated Design Build Packages for the 20-inch WM relocation
<br /> between Port of Miami and Fisher Island and 54-inch FM relocation between Miami Beach and Virginia Key.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Needs Assessment Program-Miami-Dade Water and Sewer PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Department, Miami, FL 2005 2006
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ J Check if project performed with current firm
<br /> Reinefeld served as the project manager for various water main and force main improvement projects including: Perrine-Cutler
<br />b. Ridge Basis of Design Report (BOOR) involved 9,000 LF of water mains, 1,600 LF of force main, and 6,500 LF of sanitary
<br /> sewer lines. It also included the site selection, dimensioning and sizing of a Regional Wastewater Pump Station. Alternative
<br /> review and selection was based on lower cost and system expansion as well as construction phases along US-1.
<br /> New force main from Pump Station No. 373 to a force main running along NW 196th Lane which included route selection,
<br /> pipeline design, lift station up~rades and construction support services. 6,500 LF of 8-inch water main along the area bounded
<br /> by SW 82nd Avenue to SW 85 h Avenue and SW 41 5t Street to SW 46th Street
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Design of 16-inch Distribution Pipeline for Reclaimed Water PROFESSIONAL SERVICES T CONSTRUCTION (If applicable)
<br /> Miami-Dade Water and Sewer Department, Miami, FL 2009 In Progress
<br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE [ J Check if project performed with current firm
<br /> Mr. Reinefeld was part of the design team for a 3.4 miles of 16-inch reclaimed water pipeline. Miami-Dade Water and
<br />c. Sewer Department (MDWASD), Miami, Florida MDWASD required a new reclaimed water distribution pipeline from the
<br /> Central District Wastewater Treatment Plant Water Reclamation Facility (CDWWTP-WRF), to Crandon Park Golf Course on
<br /> Key Biscayne and then from the Crandon Park Golf Course to the Village of Key Biscayne. Scopes of services included
<br /> investigate existing and proposed conditions along the transmission pipeline corridor for the purpose of establishing a
<br /> conceptual design for the new reclaimed water pipeline. The new transmission pipeline also included existing and potential
<br /> connection points alonQ the route.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Design of a 72-inch Raw Water Main-Miami-Dade Water and PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable)
<br /> Sewer Department, Miami, FL 2009 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ J Check if project performed with current firm
<br />d. Mr. Reinefeld served as a Senior Project Engineer for the design of a 72-inch Raw Water Main intended to transport raw
<br /> water from the WASD Northwest Wellfield to the Hialeah/Preston Treatment Plant. The proposed RWM served as a redundant
<br /> pipeline to the existing 96-RWM running along NW 74th Street. Scope of Services for this project The scope of work included
<br /> preparation of BODR-30%, 60%, and 90% submittal, construction documents, technical specifications, permitting and
<br /> construction support.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Design of a 60-inch Force Main-Miami-Dade Water and Sewer PROFESSIONAL SERVICES I CONSTRUCTION (If applicable)
<br /> Department, Miami, FL 2009 NI A
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I ] Check if project performed with current firm
<br />e. Mr. Reinefeld was Project Manager for a 3-mile 60-inch Force Main Project. The scope of work included preparation of the
<br />alternative routes available for the new 60-inch force main. Construction materials and methods, construction cost, ,
<br /> coordination with future planned projects, and coordination with Federal, State and County regulatory agencies, local
<br /> governments, property owners and stakeholders having interest or potential interest in this project, As part of the design
<br /> phase, Mr. Reinefeld coordinated the preparation of BODR-30%, 60%, and 90% submittal, construction documents, technical
<br /> specifications, permitting and construction support.
<br />
<br />STANDARD FORM 330 (fY2004) PAGE 1
<br />
|