Laserfiche WebLink
<br />~E" RESUM~S~OF KEY"r~,R~ONNEL ~~~~,p.~E~>FO~JH~S C-~ <br />_~';h~~~rbt.: .Jti$~~(Complete one Section E for each'key person.') . , <br /> <br />12. NAME <br />Werner J. Reinefeld, P.E. <br /> <br />13, ROLE IN THIS CONTRACT <br />Design Engineer <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />26 <1 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />CES Consultants, Inc. - Miami, FL (Headquarters) <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br />BS, Civil Engineering <br />Central University of Venezuela, 1983 <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer <br />Florida No. 63042 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Replacement of the 54-inch Force Main from the CDWWTP to PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami Beach (Government Cut) 2010 N/A <br />a. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I ] Check if project performed with current firm <br /> Mr. Reinefeld was responsible in developing and coordinating with MDWASD the Master Specifications Volume for the <br /> Design-Build Package. Duties included developing of separated Design Build Packages for the 20-inch WM relocation <br /> between Port of Miami and Fisher Island and 54-inch FM relocation between Miami Beach and Virginia Key. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Needs Assessment Program-Miami-Dade Water and Sewer PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Department, Miami, FL 2005 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ J Check if project performed with current firm <br /> Reinefeld served as the project manager for various water main and force main improvement projects including: Perrine-Cutler <br />b. Ridge Basis of Design Report (BOOR) involved 9,000 LF of water mains, 1,600 LF of force main, and 6,500 LF of sanitary <br /> sewer lines. It also included the site selection, dimensioning and sizing of a Regional Wastewater Pump Station. Alternative <br /> review and selection was based on lower cost and system expansion as well as construction phases along US-1. <br /> New force main from Pump Station No. 373 to a force main running along NW 196th Lane which included route selection, <br /> pipeline design, lift station up~rades and construction support services. 6,500 LF of 8-inch water main along the area bounded <br /> by SW 82nd Avenue to SW 85 h Avenue and SW 41 5t Street to SW 46th Street <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Design of 16-inch Distribution Pipeline for Reclaimed Water PROFESSIONAL SERVICES T CONSTRUCTION (If applicable) <br /> Miami-Dade Water and Sewer Department, Miami, FL 2009 In Progress <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE [ J Check if project performed with current firm <br /> Mr. Reinefeld was part of the design team for a 3.4 miles of 16-inch reclaimed water pipeline. Miami-Dade Water and <br />c. Sewer Department (MDWASD), Miami, Florida MDWASD required a new reclaimed water distribution pipeline from the <br /> Central District Wastewater Treatment Plant Water Reclamation Facility (CDWWTP-WRF), to Crandon Park Golf Course on <br /> Key Biscayne and then from the Crandon Park Golf Course to the Village of Key Biscayne. Scopes of services included <br /> investigate existing and proposed conditions along the transmission pipeline corridor for the purpose of establishing a <br /> conceptual design for the new reclaimed water pipeline. The new transmission pipeline also included existing and potential <br /> connection points alonQ the route. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Design of a 72-inch Raw Water Main-Miami-Dade Water and PROFESSIONAL SERVICES 1 CONSTRUCTION (If applicable) <br /> Sewer Department, Miami, FL 2009 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ J Check if project performed with current firm <br />d. Mr. Reinefeld served as a Senior Project Engineer for the design of a 72-inch Raw Water Main intended to transport raw <br /> water from the WASD Northwest Wellfield to the Hialeah/Preston Treatment Plant. The proposed RWM served as a redundant <br /> pipeline to the existing 96-RWM running along NW 74th Street. Scope of Services for this project The scope of work included <br /> preparation of BODR-30%, 60%, and 90% submittal, construction documents, technical specifications, permitting and <br /> construction support. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Design of a 60-inch Force Main-Miami-Dade Water and Sewer PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Department, Miami, FL 2009 NI A <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I ] Check if project performed with current firm <br />e. Mr. Reinefeld was Project Manager for a 3-mile 60-inch Force Main Project. The scope of work included preparation of the <br />alternative routes available for the new 60-inch force main. Construction materials and methods, construction cost, , <br /> coordination with future planned projects, and coordination with Federal, State and County regulatory agencies, local <br /> governments, property owners and stakeholders having interest or potential interest in this project, As part of the design <br /> phase, Mr. Reinefeld coordinated the preparation of BODR-30%, 60%, and 90% submittal, construction documents, technical <br /> specifications, permitting and construction support. <br /> <br />STANDARD FORM 330 (fY2004) PAGE 1 <br />