Laserfiche WebLink
<br />.'::;:' - TRAC~~~ <br />",",' , ':;'~iJi,f~~fi,~1%~(Complet~ne SectionlE for each key person.) " ..A <br /> <br />12. NAME <br />Gustavo A. Eckardt. P.E. <br /> <br />13. ROLE IN THIS CONTRACT <br />Project Engineer <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL b. WITH CURRENT FIRM <br />8 2 <br /> <br />15. FIRM NAME AND LOCATION (Ci/rand State) <br />CES Consultants, Inc. - Miami, FL (Headquarters) <br />16. EDUCATION (DEGREE AND SPECIALlZA nON) <br />B.S. Civil Engineering, University of North Carolina <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br />Professional Engineer <br />Florida No.67553 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Chi Epsilon Civil Engineering Honor Society <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SW 27'h Ave from US-1 to Bayshore Drive, Miami Dade County, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Ongoing <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I X] Check if project performed with current firm <br />a. Mr. Eckardt was a project Engineer and provided engineering services in this roadway improvement project. The project <br /> consists of widening this stretch of roadway measuring approximately 0.75 miles with significant elevation changes throughout <br /> this section of roadway and with numerous utilities located throughout this old corridor. The team has worked diligently to <br /> provide a technicallv sound and cost effective desiQn incorporatinQ all of the client's needs <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> East Miramar Redevelopment Transmission & Distribution Water PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Main Improvements Phase III, Miramar, FL 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm <br />b. Mr. Eckardt as Project Engineer provides engineering design services for the upgrade of approximately 72,000 L.F. of water <br /> mains in the City of Miramar. The project consists of upgrading existing undersized 2-inch and 4-inch residential water mains <br /> to 6-inch PVC water mains. This effort will improve pressure and provide fire protection within the area. ML Eckardt is working <br /> closely with the client to produce the most technically sound and cost effective design that incorporates all of the client's <br /> requirements and needs. Project also includes the preparation of bid documents, specifications, and permittinQ. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Miami Dade County Water & Sewer Dept. Pipeline Design 8-inch PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> DIP Water Main Project E01-WASD-05B 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ X] Check if project performed with current firm <br />C. Mr. Eckardt was responsible for the design of over 2,000LF of 8-inch Ductile Iron Pipe (DIP) water distribution pipeline in the <br /> Northeast area of Unincorporated Miami-Dade County. Mr. Eckardt was in charge of this project from conception to final <br /> design submittal. Responsibilities included utility coordination, future project coordination, bid document and specifications <br /> preparation, project scheduling updates, preparation of engineering cost estimates, design and plans preparation, and <br /> coordination with all the stakeholders. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 12-lnch Force Main Replacement Along Caribbean Boulevard, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami-Dade Water and Sewer Department (M-DWASD), Miami, FL 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />d. Mr. Eckardt was responsible for the design, plans preparation and required coordination of this project which included the <br />construction of approximately 3,500 LF OF 12-inch Ductile Iron Pipe (DIP) force main to replace the existing 1Q-inch and 12- <br /> inch asbestos cement pipe for M-DWASD. Mr. Eckardt was also involved in the design of about 100LF of sub-aqueous canal <br /> crossing under C-1 N Canal using Ball and Socket DIP, coordination and design for connections to the existing Pump Stations <br /> and force mains, design of ADA compliant sidewalks and ramps, and the preparation of Bid Documents and Specifications, <br /> includinQ the conception of a new specification of Ball and Socket DIP pipe for subaqueous crossinQs. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> NW 102 Roadway Improvements, Town of Medley, Medley, FL PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [ ] Check if project performed with current firm <br />e. Mr. Eckardt provided construction administration services for this project which included milling, paving and a new storm water <br />drainage system along NW 102 Road between 116 Way and the Tarmac Company entrance located in Medley, Florida, This <br /> roadway required the installation of drainage structures and construction of exfiltration trenches as the proposed method of <br /> meeting the drainage requirement for the improvements. Additional settling boxes were included in the drainage design to <br /> collect the large amount of silt and debris generated in this commercial roadway. <br /> <br />STANDARD FORM 330 (tY2004) PAGE 1 <br />