My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 2:32:43 PM
Creation date
11/17/2010 2:32:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />8 <br /> <br />6 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />CES Consultants, Inc. (Headquarters) <br />16. EDUCATION (DEGREE AND SPECIALIZATION) <br />B.S., Environmental Engineering <br />Louisiana State University 2002 <br />Baton Rouge, LA <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLINE) <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />Mr. Caraballo has over 8 years of experience in a variety of civil and environmental engineering project <br />delivery including, air permitting, paving and drainage project, Class IV Freshwater Wetland Permitting, and <br />South Florida Water Management District Environmental Resources Permitting. He has been able to take <br />projects from the conception stage through a successful completion. <br /> <br />19. RELEVANT PROJECTS <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />East Miramar Redevelopment Transmission & Distribution Water PROFESSIONAL SERVICES CONSTRUCTION (II applicable) <br />Main Improvements, Phase III, Miramar, FL 2009 <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (X] Check il project performed with current firm <br />a. Mr. Caraballo as Project Manager provided engineering analysis and design services for the upgrade of approximately 72,000 <br />L.F. of water main. The project consists of upgrading existing 2-inch and 4-inch residential water main to a 6-inch water main. <br />This effort will improve pressure and provide fire protection within the area. Mr. Caraballo is worked closely with the client to <br />produce the most technically sound and cost effective design that incorporates all of the client's requirements and needs. Mr. <br />Caraballo is also in char e of all ermittin efforts for this ro'ect. <br /> <br />(1) TITLE AND LOCATION (City and State) <br />Clubhouse I Restaurant for Melreese Golf Course, Miami, FL <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />2009 <br /> <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE I X] Check il project performed with current firm <br />Mr. Caraballo as Project Manager is provided civil engineering services for the design of a new restaurant / clubhouse at the <br />Melreese Golf Course. One of the design issues encountered is the existing ash contamination at the site. Mr. Caraballo was <br />also res onsible for the water and sewer ermittin as well as the draina e and site ermittin . <br /> <br />(1) TITLE AND LOCATION (City and State) <br />SW 2ih Ave from US-1 to Bayshore Drive, Miami Dade County, FL <br /> <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (II applicable) <br />On oin <br /> <br /> <br />c. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (X] Check il project performed with current firm <br />Mr. Caraballo as Pro~ect Manager is providing engineering analysis and design services for a closed storm water drainage <br />system along SW 2i Avenue between South Dixie Highway and South Bayshore Drive. The project consist of widening this <br />stretch of roadway measuring approximately 0.75 miles. Some of the design issues encountered were the elevation changes <br />throughout the stretch of roadway and the amount of utilities located throughout this older corridor. The team worked diligently <br />to provide a technically sound and cost effective design that incorporated all of the client's requirements and needs. Mr. <br />Caraballo also executed the ermittin for the draina e s stem throu h Miami-Dade Count DERM. <br />(1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br />MIA Runway 9-27 Pavement Reconstruction, Miami-Dade County, PROFESSIONAL SERVICES CONSTRUCTION (II applicable) <br />FL 2006 <br /> <br />d. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE (X] Check il project performed with current firm <br />Mr. Caraballo completed a joint effort to develop construction documents to resurface runway 9-27 at Miami International <br />Airport. Mr. Caraballo was involved in the demolition plan, pavement and geometry plan, grooving plan, pavement marking <br />lan, uantit take-off and runwa cross sections. <br />(1) TITLE AND LOCATION (City and State) <br />SFWMD Pump Station Hardening, Okeechobee, FL <br /> <br />(2) YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (II applicable) <br />2005 <br /> <br />e. <br /> <br />(3) BRIEF DESCRIPTION (Brief scope, size, cost, etc,) AND SPECIFIC ROLE [ x ] Check il project performed with current firm <br />Mr. Caraballo has completed the Assessment of 9 pump stations located around Lake Okeechobee. Mr. Caraballo acted as a <br />liaison between SFWMD staff in the field and the consulting team. Mr. Caraballo also collected data at the sites useful in the <br />assessment and desi n of this ro'ect. <br /> <br />STANDARD FORM 330 (1V2004) PAGE 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.