My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CES Consultants, Inc.
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
CES Consultants, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 2:32:43 PM
Creation date
11/17/2010 2:32:29 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />20. EXAMPLE PROJECT <br />KEY NUMBER <br /> <br />6 <br /> <br />21. TITLE AND LOCATION (City and State) <br />Herbert Hoover Dike Rehabilitation, Reach 1 Cutoff Wall, lake <br />Okeechobee, Florida <br /> <br />22. YEAR COMPLETED <br />PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br />Ongoing <br /> <br />23. PROJECT OWNER'S INFORMATION <br /> <br />a. PROJECT OWNER <br />United States Army Corp of <br />Engineers <br /> <br />b. POINT OF CONTACT NAME <br />Saxby Anderson, P.E. <br /> <br />c. POINT OF CONTACT TELEPHONE NUMBER <br />561.472.3500 <br /> <br />24. BRIEF DESCRIPTION OF PROJECT AND RELEVANCE TO THIS CONTRACT (Include scope, size, and cost) <br /> <br />Lake Okeechobee is the second largest fresh water lake that lies entirely within the United States. The <br />143-mile earth dike system that encircles lake Okeechobee has numerous water controls that provide <br />flood reduction, navigation, recreation and fresh water for the communities of South Florida & other local <br />and federal agencies. The Herbert Hoover Dike Rehabilitation, Reach 1, Seepage Cutoff Wall project <br />consists of the construction of a soil, cement, bentonite mix cutoff wall to control seepage through and <br />under the embankment. Reach 1 started form Belle Glade and ended at Port Mayaca. <br /> <br />CES Consultants, Inc. staff are perfromin O/A materials testing services for all four phases of the above <br />stated Army Corp project and is performing the following tests as per ASTM, AASHTO, Florida <br />Department of Transporation (FOOT) Standards. <br /> <br />./ Collect & Transport Special Soil-Cement Cylinders and Cores Samples from the site & from the <br />Contractor's on site Laboratory to the CES Laboratory for testing <br />./ Perform 28- Days unconfined compressive strength testing as per ASTM 0-2166 <br />./ Perform Permeability tests on soil-cement bentonite samples as per ASTM 0-5084 to check the <br />cutoff wall in-place permeability <br /> <br /> <br />.,11- <br /> <br />25. FIRMS FROM SECTION C INVOLVED WITH THIS PROJECT <br /> <br /> (1) FIRM NAME (2) FIRM LOCATION (City and Stale) (3) ROLE <br />a. CES Consultants, Inc. Miami lakes, Florida Q/A Materials Testing <br /> (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />C. <br />f. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br />h. (1) FIRM NAME (2) FIRM LOCATION (City and State) (3) ROLE <br /> <br />STANDARD FORM 330 (ty.!004) PAGE <br />
The URL can be used to link to this page
Your browser does not support the video tag.