Laserfiche WebLink
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Comolete one Section E for each key oerson.! <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Lynn Kiefer, PWS Environmental Services a. TOTAL I b. WITH CURRENT FIRM <br /> 20 18 <br />15. FIRM NAME AND LOCATION (City and State) <br /> Kimley-Horn and Associates, Inc., Vero Beach, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br /> Bachelor of Science/Marine Biology/Auburn University FLlPWS/000949 <br /> Master of Science/Coastal Zone <br /> Management/Oceanography/Florida Institute of Technology <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br /> ~ nf <br /> 19. RELEVANT PROJECTS <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Continuing Environmental Services PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Plantation, FL 2003 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Project manager. KHA was responsible for completing the Programmatic Categorical Exclusion checklist and documentation for <br />a. four Local Agency Program (LAP) funded projects in the City of Plantation, including a bus tram stop project, streetscape <br /> improvements to NW 84th Street, a linear park along the C-12 canal and a multi-use trail project. The LAP program provides <br /> federal funding for municipal projects. The services involved evaluating the sites for wetlands, listed species and contamination <br /> involvement, and completing the documentation to demonstrate that the project impacts were minor and could meet the <br /> requirements to categorically exclude the project from the National Environmental Policy Act. Documentation was submitted to <br /> the Florida Department of Transportation on behalf of the City for review and approval. Total project cost: $95,000. <br /> (1) TITLE AN D LOCATION (City and State) (2) YEAR COMPLETED <br /> MDX Design Engineering for SR 874 from Kendall Drive to SR 826 PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Miami, FL <br />b. (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Serving as environmental scientist for the Kimley-Horn team that is providing design engineering services for SR 874 (Don <br /> Shula Expressway) roadway modifications from south of SW 88th Street (Kendall Drive) to south of SR 826 (Palmetto <br /> Expressway)/SR 874 interchange. This project is ongoing; firm fee: $2.2 million; total project cost: $80 million (est.). <br /> (1) TITLE AN D LOCA TION (City and State) (2) YEAR COMPLETED <br /> Ocean Sands PROFESSIONAL SERVICES I CONSTRUCTION (If Applicabfe) <br /> Indian River County, FL <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Serves as project manager for this ocean front residential development. Kimley-Horn has been responsible for all site planning, <br />c. environmental assessments, dune cross over design, permitting including Coastal Construction Control Line permitting, traffic <br /> analysis, and roadway design along SR AlA for this high end ocean front residential development. Detailed coordination was <br /> required with the Florida Department of Environmental Protection for the stormwater management system and for the coastal <br /> permitting. Detailed sea turtle protection plans were prepared and approved by the Florida Fish and Wildlife Conservation <br /> Commission. This project is ongoing; firm fee (to date): $480,775. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Arlington Lakes PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Naples, FL 2005 <br /> (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Environmental task manager for the environmental resource permit (ERP) and U.S. Army Corps of Engineers (USACE) Section <br /> 404 dredge and fill permit. Worked with the client's previous design engineer to obtain the conceptual ERP. The project <br /> involved approximately 30 acres of wetland impact and Kimley-Horn developed a mitigation plan that was a flow way concept <br />d. that connected the mitigation on this site to mitigation within projects north and east of the site and allowed for future projects <br />south and west of the site to connect to the overall flow way. The flow way on the Arlington Lakes site was the largest portion of <br /> the overall flow way and was the central link between to previously permitted flow ways. Kimley-Horn was also hired to prepare <br /> all site civil construction plans for a modified design and obtained all local government approvals for this modified plan. <br /> Permitting required extensive coordination with USACE, South Florida Water Management District, the U.S. Environmental <br /> Protection Agency, and the U.S. Fish and Wildlife Service. The ERP and Section 404 permit applications involved extensive <br /> alternatives analyses evaluations, secondary and cumulative impact assessments, and detailed mitigation and monitoring plan <br /> preparation. The mitigation plan included an approximately 22-acre onsite mitigation area consisting of wetlands enhancement <br /> and a mosaic of forested and herbaceous wetland creation. Firm fee: $24,030. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> South Florida Regional Transportation Authority General Planning PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Consultant, Miami-Dade/Broward/Palm Beach Counties, FL <br /> (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br />e. Environmental scientist responsible for several documented categorical exclusions for several proposed improvements at Tri- <br /> Rail Stations in West Palm Beach, Pompano Beach and Dania. Also responsible for environmental reviews of three potential <br /> new station sites in Palm Beach and Broward County as part of a master plan review. This project is ongoing; firm fee: <br /> $750,000; total project cost: $1 million. <br /> <br />STANDARD FORM 330 (1/2004) <br /> <br />~-n Kimley-Horn <br />IIIIIII....J_ U and Associates, Inc. <br />