Laserfiche WebLink
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> Complete one Section E for each kev Derson.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Rene Portieles, P.E. Structural Engineering a. TOTAL I b. ~ITH CURRENT FIRM <br /> 9 <br />15. FIRM NAME AND LOCATION (City and State) <br /> Kimley-Horn and Associates, Inc., West Palm Beach, FL <br />16. EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE) <br /> Bachelor of Science/Civil and Environmental Engineering/Florida FL/P.E./64035 <br /> International University <br /> Master of Science/Structural Engineering/University of Florida <br />18. OTHER PROFESSIONAL QUALIFICATIONS IPublications, Omanizations Trainino. Awards etc.) <br /> 19. RELEVANT PROJECTS <br /> (1 ) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Sugar Sand Park Design PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Boca Raton, FL 2005* (Phase 1) <br /> (3) BRIEF DESCRIPTION (Briel scope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br />a. Project engineer for the Kimley-Horn team that assisted the Greater Boca Raton Beach and Park District with the site planning, civil design, <br /> landscape design, environmental permitting, and installation of the carousel as part of the overall development of Phase IV of Sugar Sand <br /> Park. The entire park consists of 132 acres of passive and active recreation facilities, including a community center with a theatre and <br /> science center, field house, baseball/softball fields, in-line hockey rink, science playground, and picnic pavilions. Kimley-Horn's services for <br /> Sugar Sand Park will continue with master planning, environmental permitting, and design of facilities for the development of the final phase <br /> of the park. *Phase 4 of this project is onaoina; firm fee: $1 million (desian); $400,000 (master plan); construction cost: $7 million (est.). <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Turnpike Widening from HEFT to Johnson Street PD&E Study and PROFESSIONAL SERVICES I CONSTRUCTION (II Applicable) <br /> Design, Broward County, FL 2009 <br />b. (3) BRIEF DESCRIPTION (Briel scope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Provided preliminary bridge design layout for the Turnpike widening over Pembroke Road. The Kimley-Horn team provided simultaneous <br /> PD&E and design services to widen Florida's Turnpike Mainline from the Homestead Extension of Florida's Turnpike (HEFT) to just north of <br /> Johnson Street in Broward County. Firm fee: $5.59 million; construction cost: $130.5 million. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Port of Miami Command and Control Center Design and PROFESSIONAL SERVICES 1 CONSTRUCTION (If Applicable) <br /> Integration, Miami, FL <br /> (3) BRIEF DESCRIPTION (Briefscope, size. cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Serving as project engineer for Kimley-Horn team. This project involves several separate phases to provide the renovations to an existing <br /> terminal to support the command and control center functions at the Port of Miami. Kimley-Horn's early planning level tasks included <br /> meetings with stakeholders and Port staff to identify control center requirements that were then summarized in a Concept of Operations <br />c. (CONOPS) document. Following the CONOPS, the design of the interior upgrades to support the control center and supporting offices is <br /> ongoing and includes the discovery of infrastructure, security, communications, command and control equipment inventory, reviews and <br /> guidance in existing plan sets, and cost estimates. Also included in the design is the communications design to support the network room <br /> that will house all the portwide systems. The design effort will also produce an extension of the integration fiber optic network to additional <br /> areas of the Port. This project entails the relocation/migration of old communications equipment to the new network room from the old <br /> command center without any or very little disruption to the communications system. Kimley-Horn is providing production of construction <br /> packages, feasibility and operational reports, post-design phase services, and coordination with the client This project is ongoing; firm fee <br /> (to date): $250,000; total project cost: $4 million. <br /> (1 ) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Harbor Branch Reverse Osmosis Water Treatment Plant (ROWTP) PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Fort Pierce, FL <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br /> Served as project engineer to perform assessment of tank inspection and provide a tank inspection report. KHA is involved in the planning, <br /> design, permitting, and construction phase services for the Harbor Branch Oceanographic Institute's (HBOI) expansion of its existing <br />d. ROWTP from a capacity of 33,780 GPD to 80,000 GPD. HBOI owns and operates a ROWTP that converts surficial aquifer water to drinking <br /> water to serve their main campus. HBOI intends to increase capacity to meet the growing demands of the facility. KHA performed a due <br /> diligence review of the existing ROWTP and was able to identify and recommend improvements that would both increase the plant's <br /> capacity and make the operations of the plant more cost-effective. The proposed improvements have been designed in phases in order to <br /> immediately increase the capacity of the existing facility while planning and designing for the complete expansion of the facility. We are also <br /> responsible for modifying the plant's existing water use and industrial wastewater permits to reflect the increase in the plant's capacity. This <br /> project is ongoing; project cost: $15,000 (design); $100,000 (construction). <br /> (1 ) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Property Condition Assessments PROFESSIONAL SERVICES I CONSTRUCTION (If Applicable) <br /> Sunny Isles Beach, Miami, Kissimmee, and Weston, FL <br /> (3) BRIEF DESCRIPTION (Briefscope, size, cost. etc.) AND SPECIFIC ROLE [Xl Check if project performed with current firm <br />e. Serves as project engineer for a variety of commercial and industrial building assessments of structural, mechanical, electrical, and <br /> plumbing systems. Early planning level tasks included meetings with site managers, attorneys, and building engineering staff to identify <br /> deficiencies throughout the systems. Following the assessment, portions of the report that require immediate repair action are designed. <br /> The plans and specification are then permitted and construction phase services are provided. Recent projects include the design of <br /> drainage and utility systems that were not performing as originally designed. These projects are ongoing; total project cost to date: <br /> $400,000. <br /> <br />STANDARD FORM 330 (1/2004) <br />~_ n Kimley.Horn <br />IIII.....J_ U and Associates, Inc. <br />