My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Fraga Engineers
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
Fraga Engineers
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/17/2010 3:42:00 PM
Creation date
11/17/2010 3:41:50 PM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />12. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br />Mechanical Engineer <br /> <br />14. YEARS EXPERIENCE <br />a. TOTAL lb. WITH CURRENT FIRM <br /> <br />35 I 25 <br /> <br />Irene F. Fraaa PE LEED AP <br />15. FIRM NAME AND LOCATION (City and Statel <br /> <br />Fraga Engineers, LLC (Coral Gables, <br /> <br />16. EDUCATION (DEGREE AND SPECIALiZATiON) <br /> <br />BS Architectural Engineering, <br />University of Miami <br /> <br />FL) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STATE AND DISCIPLiNEI <br />Florida Professional Engineer U19922 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training. Awards, etc.1 <br />ASHRAE, NFPA, LEED AP <br /> <br /> (1) TITLE AND LOCATION (City and Statel (2) YEAR COMPLETED <br /> State School YYY-1 PROFESSIONAL SERVICES ICONSTRUCTION (If applicablel <br /> Miami, FL 2008 2010 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.1 AND SPECIFIC ROLE lliJ Check if ptoject performed with current firm <br />a. <br /> The total overall scope of this project, completed in 2010, included the design of a new <br /> $35 mi 11 ion 1864 student station 178,000 square foot high school (pending LEED <br /> certification) . Irene Fraga served as Mechanical Engineer for this project, which is <br /> expected to be the first LEED Gold certified public school In Miami-Dade County. <br /> (1) TITLE AND LOCATION (City and Statel (2) YEAR COMPLETED <br /> State School HHH-1 PROFESSIONAL SERVICES ICONSTRUCTION (if applicablel <br /> Miami, FL 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.1 AND SPECIFIC ROLE ~ Check if ptoject performed with current firm <br />b. <br /> The total overall scope of this $50 million project, which was designed in 2009, <br /> included the re-use and re-design of an prototype high school design. Irene Fraga <br /> served as Mechanical Engineer for this 2000 student station 223,000 squa re foot high <br /> school for M-DCPS, which was designed to LEED standards. <br /> (1) TITLE AND LOCATION (City and Statel (2) YEAR COMPLETED <br /> Southwest Senior HS Addition PROFESSIONAL SERVICES ICONSTRUCTION (If applicablel <br /> Miami, FL 2006 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.1 AND SPECIFIC ROLE l2U Check if project performed with current firm <br />c. <br /> The total overall scope of this $9 million project completed in 2006 included a 61,000 <br /> square foot 3-story addition to Southwest Senior High School. Irene Fraga served as DCP <br /> Mechanical Engineer for this project. The project program included Classrooms, <br /> bathrooms, satellite Cafeteria, Covered Dining Shelter, satellite Chiller, and Admin. <br /> (1) TITLE AND LOCATION (City and Statel (2) YEAR COMPLETED <br /> Miami CenLral Senior High School PROFESSIONAL SERVICES I CONSTRUCTION (If applicablel <br /> Miami, FL 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.1 AND SPECIFIC ROLE l2U Check if ptoject performed with current firm <br />d. <br /> Irene Fraga served as Mechanical Engineer of this $50 million complex phased replacement <br /> project. Project scope included a new Administration, Classrooms, Media Center, <br /> Cafeteria, Auditorium, Vocational Labs, Art & Music Suite, and Playfields & Parking <br /> areas. <br /> (11 TITLE AND LOCATION (City and Statel (2) YEAR COMPLETED <br /> Miami-Dade College of Policing PROFESSIONAL SERVICES I CONSTRUCTION (If applicablel <br /> Miami, FL 2007 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.1 AND SPECIFIC ROLE lliJ Check if project performed with current firm <br />e. <br /> Irene Fraga served as Mechanical Engineer for a $40 mi 11 ion joint facility for the City <br /> of Miami Police Department and a magnet high school for M-DCPS. <br /> <br />1 9. RELEVANT PROJECTS <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.