Laserfiche WebLink
<br />12. NAME <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br />(Complete one Section E for each key person.) <br />13. ROLE IN THIS CONTRACT <br /> <br />Electrical Engineer <br /> <br />14. <br />a. TOTAL <br /> <br />Cristina Santa-Cruz PE LEED AP <br />15. FIRM NAME AND LOCATION (City and State! <br /> <br />Fraga Engineers, LLC (Coral Gables, <br />16. EDUCATION (DEGREE AND SPECIALlZATlONl <br /> <br />BS Electrical Engineering, <br />University of Miami <br /> <br />11 <br /> <br />YEARS EXPERIENCE <br />lb. WITH CURRENT FIRM <br />I 11 <br /> <br />Fr.) <br /> <br />17. CURRENT PROFESSIONAL REGISTRATION (STA TE AND DISCIPLINE! <br />Florida Professional Engineer #59489 <br /> <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards. etc.! <br /> <br />LEED AP <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State! (2) YEAR COMPLETED <br /> State School YYY-l PROFESSIONAL SERVICES ICONSTRUCTION (II applicable! <br /> Miami, FL 2008 2010 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.! AND SPECIFIC ROLE ill Check if project performed with current firm <br />a. <br /> The total overall scope of this project, completed in 2010, included the design of a new <br /> $35 million 1864 student station 178,000 square foot high school (pending LEED <br /> certification) . Cristina Santa-Cruz served as Electrical Engineer for this project, <br /> which is expected to be the first LEED Gold certified public school In Miami-Dade. <br /> (1) TITLE AND LOCATION (City and State! (2) YEAR COMPLETED <br /> State School HHH-1 PROFESSIONAL SERVICES I CONSTRUCTION (II applicable! <br /> Miami, FL 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.! AND SPECIFIC ROLE ~ Check if project performed with current firm <br />b, <br /> The total overall scope of this $50 million project, which was designed in 2009, <br /> included the re-use and re-design of an prototype high school design. Cristina <br /> Santa-Cruz served as Electrical Engineer for this 2000 student station 223,000 square <br /> foot high school for M-DCPS, which was designed to LEED standards. <br /> (1) TITLE AND LOCATION (City and State! (2) YEAR COMPLETED <br /> Southwest Senior HS Addition PROFESSIONAL SERVICES ICONSTRUCTION (If applicable! <br /> Miami, FL 2006 2006 <br /> (31 BRIEF DESCRIPTION (Brief scope, size, cost, etc.! AND SPECIFIC ROLE l2U Check if project performed with current firm <br />c. <br /> The total overall scope of this $9 million project completed in 2006 included a 61,000 <br /> square foot 3-story addition to Southwest Senior High School. Cristina Santa-Cruz <br /> served as DCP Electrical Engineer for this project. The project program included <br /> Classrooms, satellite Cafeteria, Covered Dining Shelter, satellite Chiller, and Admin. <br /> (1) TITLE AND LOCATION (City and State! (2) YEAR COMPLETED <br /> Miami Central Senior High School PROFESSIONAL SERVICES ICONSTRUCTION (If applicable! <br /> Miami, FL 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.! AND SPECIFIC ROLE l!U Check if project performed with current firm <br />d. <br /> Cristina Santa-Cruz served as Electrical Engineer of this $50 million complex phased <br /> replacement project. Project scope included a new Administration, Classrooms, Media <br /> Center, Cafeteria, Auditorium, Vocational Labs, Art & Music Suite, and Playfields & <br /> Parking areas. <br /> (1) TITLE AND LOCATION (City and State! (2) YEAR COMPLETED <br /> Miami-Dade College of Policing PROFESSIONAL SERVICES ICONSTRUCTION (If applicable! <br /> Miami, FL 2007 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.! AND SPECIFIC ROLE l!U Check if project performed with current firm <br />e. <br /> Cristina Santa-Cruz served as Electrical Engineer for a $40 million joint facility for <br /> the City of Miami Police Department and a magnet high school for M-DCPS. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 2 <br />