Laserfiche WebLink
<br />\\V <br /> <br />PROJECT HISTORY <br /> <br />Sunset Harbor Parking Building <br />Electrical Engineering Design <br /> <br /> <br />:.t <br /> <br />Project Description: <br /> <br />Mr. Jorge Rodriguez was responsible for the Electrical design on this building. The design provided <br />power, lighting, telephone, data, CCTV, and fire alarm system to the tenants and parking areas in <br />coordination with other disciplines. Power and telecom systems were coordinated with the <br />corresponding Utilities for service entrances connection. An emergency generator was specified. <br /> <br /> <br />- "'Ir'--""~" <br />~~ <br />~ <br />~., <br />-'~ <br />:/iff- ,.. I <br /> <br />FlU - Primera Casa(PC) Building <br />Electrical Engineering Design <br /> <br />Project Description: <br /> <br />Mr. Jorge Rodriguez was responsible for the Electrical design to upgrade the power quality serving the <br />Computer area. It was necessary to replace the existing UPS and Electrical panels. This required <br />special coordination with the existing generator to proceed. Consulting and commissioning services <br />were also provided. <br />