Laserfiche WebLink
<br />prevented the exfiltration trenches from being clogged and provided the city easy access for any <br />maintenance requirements. CWI assisted the City in acquiring Grant funding from SFWMD to pay for <br />the drainage improvements. We also provided the construction administration services. <br />const. Cost: $580,000 Fees: $120,000 Contract Duration: 2 years, <br />Client Contact: Mr. Melvin Wolfe, Town Attorney, Phone: 305-887-9541 x166, Fax: 305-882-1491 <br />Prime Consultant: cWI Results: Com 1eted 2006 <br />Belen Area Drainage Improvements. <br />Client: Miami-Dade County DERM <br />Description of work: Belen Area Drainage Improvements from SW 8th Street to <br />NE 6th Street and from SW 132nd Avenue to SW 1 1 8th Avenue Miami-Dade, FL <br />This project included the study and design of drainage improvements for a one <br />and one-half square mile area funded by FEMA. The drainage analysis and <br />report was developed with 23 basins and included approximately 5 miles of <br />exfiltration trench, conveyance piping, two 110 cfs storm water pump stations running in parallel and two <br />outfalls to the adjacent Tamiami Canal. <br />Const. Cost: 25 million Fees: $600,000 Contract Duration: 7 years. <br />Client Contact: Design Mr. Tony Cotarelo, P.E., Mr. Alex Barrios, MD Public Works, 305-375-4772 <br />Prime Consultant: cWI Results: Completed 2005 <br />SW 77th Ave., SW 75th Ave., and SW 86th Ave. Drainage Improvements. <br />Client: Village of Palmetto Bay <br />Description of work: Village of Palmetto Bay Drainage Improvements -This <br />project included improvements for three drainage areas including the residential <br />streets ofSW 77th Ave., SW 75th Ave. And SW 86th Ave. cWI researched the <br />existing drainage catch basins and site conditions within the specified areas. A <br />drainage system was designed, and drainage calculations were prepared in <br />accordance with Village of Palmetto Bay and Miami-Dade County standards. <br />Drainage permits were obtained from DERM for this project. An existing South Florida Water <br />Management District Canal outfall was used as an emergency overflow in one basin. <br />Const. Cost: $700,000 Fees: $50,300.00 <br />Contract Duration: 1 year Client Contact: Mr. Ron Williams, Village Manager, 305-259-1236 <br />Prime Consultant: CWI Results: Completed 2008 <br />SR-834 (Sample Road) 3R Milling and Resurfacing <br />from West of NW 54th Ave. to East of Tradewinds Park Road <br />Client: Florida Department of Transportation-District 4 <br />Description of Work: Roadway widening for bike lanes, signalization, milling and resurfacing. <br />This segment ofSR-834 is a six-lane, divided principal arterial roadway with raised landscaped medians, <br />flush stabilized shoulders, and drainage swales. The project is located within the cities of Coconut Creek <br />and Margate and included: <br />· Milling and resurfacing of the existing roadway to extend the service <br />life (two typical sections with one pavement design) <br />· Added Bike Lanes with shoulder pavement widening <br />· Address ADA issues and safety concerns <br />· Level II Community Action Plan <br />· Level 1 Traffic Control Plan <br />· Utility Coordination <br />· Pavement Marking Replacement <br />· Signal Upgrades (2 suspended box to Mast Arm intersections). Special Mast Arm design <br /> <br />City of Sunny Isles Beach <br /> <br />Page 4 <br /> <br /> <br /> <br /> <br />Civil Works, Inc. 7855 NW 12 Street, Suite 218 Dora I , FL 33126 Ph: 305-448-5955 Fax: 305-591-4074 <br />