|
<br />CITY OF SUNNY ISLES BEACH
<br />SECTION THREE: ADDITIONAL INFORMATION
<br />
<br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br /> (Complete one Section E for each key person.)
<br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE
<br /> Mark Kline, P .E. Roadway Design .. 0 AL 1 b, WITH CURRENT FIRM
<br /> 24 years 20 years
<br />15. FIRM NAME AND LOCATION (City and State)
<br />KEITH AND SCHNARS - Fort Lauderdale, FL
<br />16, EDUCATION (DEGREE AND SPECIALlZA nON) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND
<br /> DISCIPLINE)
<br />B.5., Civil Engineering, Ohio University, Athens, OH, 1983 Registered Professional Engineer, , FL #440 16
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.)
<br />Timing Traffic Signals with TEAPAC, PASSER, TRANSY and NETSIM/ CORSIM, February 1998
<br /> 19. RELEVANT PROJECTS
<br /> (2) YEAR COMPLETED
<br /> I) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> SR-? (US 441) Roadway Reconstruction and Widening applicable) N/A
<br /> Broward County, FL 2004
<br />a
<br /> (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE 0611 Check if project performed with current firm
<br /> Engineering design plans for the reconstruction and widening of SR 7 (US 441) corridor from SW 33 Street (Osceola Drive) to SW 51 Street in
<br /> Broward County, Florida. This project involves the preparation of roadway plans, drainage analysis and permitting, signing and marking plans,
<br /> signalization plans, lighting plans and landscape plans. Cost: $1,350,000
<br /> (2) YEAR COMPLETED
<br /> (I) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> Atlantic Boulevard (SR-814) Enhancement Project (CPTED 2002 applicable) N/A
<br /> Pompano Beach, FL
<br />b (3) BRIEF DESCRIPTION (Briefscope, size, cost, etc.) AND SPECIFIC ROLE 0611 Check if project performed with current firm
<br /> Engineering design plans for milling, resurfacing and the incorporation of safety and esthetic enhancements to the Atlantic Boulevard (SR-814)
<br /> corridor from NE 23 Avenue to SR-AIA in the City of Pompano Beach, Florida, This project involves the preparation of roadway plans, drainage
<br /> analysis and permitting, signing and marking plans, signalization plans, lighting plans and landscape plans, Cost: $712,000
<br /> (2) YEAR COMPLETED
<br /> (I) TITLE AND LOCATION (City and State) PROFESSIONAL SERVICES CONSTRUCTION (If
<br /> Powerline Road Widening 2007 applicable) N/A
<br /> Broward County, FL
<br />c
<br /> (3) BRIEF DESCRIPTION (Briefscope, size, cost. etc.) AND SPECIFIC ROLE 0611 Check if project performed with current firm
<br /> Completed engineering design plans for the milling, resurfacing, and widening of Powerline Road from Sample Road to the north of SW 10 Street
<br /> (Sawgrass Expressway) in Broward County, Florida, This project involved the preparation of roadway plans, drainage analysis and permitting, signing
<br /> and marking plans, signalization plans, lighting plans and landscape plans,
<br />
<br />AUTHORIZED FOR lOCAl REPRODUCTION
<br />MANDATORY USE DATE OF FORM 61'2004
<br />
<br />RFQ#10-04-01
<br />
<br />PAGE ]7
<br />
<br />STANDARD FORM 330 (112004) PAGE 7
<br />
<br />::J/. \'I'~ KEITH and SCHNARS, P.A,
<br />:: ~1 FLORlDAs {3it lOCAL FIRM
<br />~
<br />
<br />....""'-..., -"
<br />
|