Laserfiche WebLink
<br />CITY OF SUNNY ISLES BEACH <br />SECTION THREE: ADDITIONAL INFORMATION <br /> <br /> E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> (Complete one Section E for each key person.) <br />12. NAME 13. ROLE IN THIS CONTRACT 14. YEARS EXPERIENCE <br /> Jonathan Weymouth, P.E. Construction Management a. 0 AL 1 b, WITH CURRENT FIR <br /> 18 years I year <br />15, FIRM NAME AND LOCATION (City and Slale) <br />KEITH AND SCHNARS - Fort Lauderdale, FL <br />16, EDUCATION (DEGREE AND SPECIALIZATION) 17. CURRENT PROFESSIONAL REGISTRATION (STATE AND <br /> DISCIPLINE) <br />B.S., Architectural Engineering University of Miami, 1990 Registered Professional Engineer, FL #52802 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards. elc.) <br /> N/A <br /> 19. RELEVANT PROJECTS <br /> (2) YEAR COMPLETED <br /> I) TITLE AND LOCATION (Cily and Slale) PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Task II - Roadway Landscaping and Aesthetic Improvement 2008 applicable) N/A <br /> Project <br /> Broward County, FL <br />a (3) BRIEF DESCRIPTION (Briefscope, size, cos!, elc.) AND SPECIFIC ROLE DIi1I Check if project performed with current firm <br /> Design and Construction Project Manager at FLL for Broward County's Design/ Bid/Build Contract. a 10 year project with an estimated <br /> construction cost of 5,5 million dollars, The project provides landscaping and aesthetic improvements for the US-I Right of Way from 1-595 to <br /> Griffin Road, The project provides tree canopy mitigation for all of the Airport Expansion Program (AEP) projects. The landscaping and aesthetic <br /> improvements covered approximately 90 acres of Florida Department of Transportation (FDOT) Right of Way which provide a unique gateway into <br /> the Airport, <br /> (2) YEAR COMPLETED <br /> (I) TITLE AND LOCATION (Cily and Slate) PROFESSIONAL SERVICES CONSTRUCTION (If <br /> 2008 applicable) N/A <br /> Task III - Exit Roadway Project <br /> Broward County, FL <br />b (3) BRIEF DESCRIPTION (Briefscape. size, casl. elc.) AND SPECIFIC ROLE DIi1I Check if project performed with current firm <br /> Design Project Manager at FLL for Broward County's Design-Build Contract, an 8 year project with an estimated construction cost of 75 million <br /> dollars. The Exit Roadways project involves the design and construction of the third phase of the upper and lower level roadway system, This <br /> project will connect the eastern end of the upper and lower level roadways in front of Terminal 4 and direct traffic east to the Task 2 roadways <br /> leaving the airport completed in 2003, The project is temporarily on hold while the airport evaluates its airfield needs and the impact to this <br /> roadway system, <br /> (2) YEAR COMPLETED <br /> (I) TITLE AND LOCATION (Cily and Slate) PROFESSIONAL SERVICES CONSTRUCTION (If <br /> Concourse A and Apron Project 2008 applicable) N/A <br /> Broward County, FL <br />c (3) BRIEF DESCRIPTION (Briefscope, size. cos!, elC) AND SPECIFIC ROLE DIi1I Check if project performed with current firm <br /> Planned and executed more than a dozen special events and projects for the Seminole Tribe of Florida, Examples of these ceremonial events include <br /> ribbon-cutting ceremonies for the State Road 7 Road-Widening project, the Mitchell Cypress Trail of Fitness, the Immokalee Water and <br /> Wastewater Treatment Plant, the Big Cypress Water Treatment Facility. the Brighton Water Treatment <br /> Cost: N/A <br /> <br />AUTHORIZED FOR lOCAL REPRODUCTION <br />MANDATORY USE DATE OF FORM 612004 <br /> <br />STANDARD FORM 330 (1/2004) PAGE 8 <br /> <br />RFQ# 10-04-0 t <br /> <br />PAGE 18 <br /> <br />:lJI: \.I'~ KEITH and SCHNARS, P.A, <br />~ ~: FlORlDAsBjllOCAL FIRM <br />-- <br /> <br />,,~.., ,. .'~..~ -, <br />