My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BCC Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
BCC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2010 9:19:36 AM
Creation date
11/18/2010 9:19:18 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Ir CITY OF SUNNY ISLES BEACH RLco <br /> <br />Request for Qualifications No. 10-04-01 · Professional Engineering Services <br /> <br />expectations which include being on time and within budget. A continuous quality control process goes a long way <br />in identifying key issues. <br /> <br />As the consultant, Bee Engineering will have a responsibility to ensure that the design and construction documents <br />meet the highest possible standards for accuracy and completeness. In order to ensure we meet these high <br />standards, our quality assurance manual documents detail checking procedures, and place an emphasis on <br />continuous monitoring, coordination, communication, review and checking. <br /> <br />Bee Engineering will also prepare a project-specific Quality Control Plan that will define QC <br />personnel, their roles, schedule and review requirements. Committing the appropriate staff to <br />the QC team is essential, and the team will be composed of a group of professionals that are <br />highly skilled in their areas of expertise and are completely independent of the design team. <br />Their reviews will be separated into three major areas: <br /> <br />· Review of the engineering design and criteria, <br />ChKkHt- Oat.. <br />· Review of the plans preparation including that component sets have been properly ~~.r~~~~.~~::::=== <br />V,ffifieod: -Date: <br />coordinated, and <br />· Constructability reviews. <br /> <br />Prior to any submittal to the City of Sunny Isles Beach, documents will be reviewed as follows: <br /> <br />· Documents are stamped as ready for review and forwarded to reviewers specified in the QA/QC plan. <br />· After QA/QC reviews, mark-ups and comments are sent back to the designer/originator. <br />· Designer reviews, comments and develops responses. <br />· Designer and reviewer meet to agree on implementation of comments. <br />· Any disagreements are forwarded to the QA/QC officer for resolution. <br />· Comments are implemented and back checked. <br /> <br />All QA/QC documents will have a tracking stamp applied to them and will be initialed and dated by the responsible <br />professionals. QA/QC documents will be retained in our offices and will be made available to the city if requested. <br /> <br />Experience on Similar Proiects <br /> <br />~ <br /> <br />Quality Control <br />RECORD DOCUMENT <br /> <br />Bee OU"llTY DRIVEN <br />-.. <br /> <br />The following is a partial list of BCC Engineering projects. All of the projects presented were chosen because they <br />depict relevant experience which can be directly applied to the City of Sunny Isles Beach Professional Engineering <br />Services Contract. <br /> <br />General Engineering Services City of Miami, Miami-Dade County, Florida - BCC Engineering was selected to provide <br />General Engineering Services for the City of Miami. Some of the Assignments completed under this contract were: <br />· San Marco Island Roadway and Drainage Improvements <br />· NW 7th Street and NW North River Drive Greenway design, and <br />· NW South River Drive Greenway design <br />Project Manager: Jose Lago, P.E. <br />E-Mial: JLago@ci.miami.jl.us <br />Contact Number: (305) 416-1252 <br /> <br />MD Water and Sewer Department General Engineering Services, Miami-Dade County, Florida - BCC Engineering <br />was selected to provide engineering services to WASD. Some of the Assignments completed under this contract <br />were: <br />· City of Miami Undersized Water Main Replacement <br />· Miami Shores and EI Portal Undersized Water Main Replacement <br />· Pump Station Rehabilitation and Force Main Extension <br />Project Manager: Felix Valdes <br />E-Mail: FValdes@miamidade.gov <br />Contact Number: (786) 552-8263 <br /> <br />91Page <br />
The URL can be used to link to this page
Your browser does not support the video tag.