Laserfiche WebLink
<br />12. NAME <br /> <br />Shahin Hekmat, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />Com fete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br /> <br />Project Manager <br /> <br /> <br />14. YEARS EXPERIENCE <br />A. TOTAL B. WITH CURRENT FIRM <br /> <br />21 <br /> <br />1 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />B.S.C.E., University of Miami, 1999 Professional Engineer, Florida 49941 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training. Awards, etc.) <br />Advanced Work Zone Traffic Control (Feb 2012) PSMJ Project Management Boot Camp I <br />FDEP Storm Water, Erosion, and Sediment Control Inspection Training Environmental Permitting Summer School <br />FES Storm Water Management Design AdlCPR Hands-on Training <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> South Dade Regional Water Reclamation Plant - Task 4, Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> County, Florida 2008 - on going 2014 <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE iii Check if project performed with current firm <br />a. Project Manager to provide services including the identification of all the Federal, State and Local regulatory requirements for <br /> the project. In addition to the permit requirements of each agency, guidance to facilitate and expedite the review process was <br /> identified where applicable. Under this Task Preliminary Site Plans were also developed based on process and non-process <br /> building requirements, flood plain criteria, zoning requirements, site drainage and water quality, vehicular access and chemical <br /> delivery needs, parking code, pedestrian and vehicular circulation, nose and site lighting and the overall site security <br /> requirements for a treatment facility. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Construction Engineering Inspection (CEI) of the Sunny Isles Boulevard, PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> City of Sunny Isles Beach, Florida 2007 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />b. Construction Administrator responsible for the construction oversight of roadway improvements and sidewalk enhancement <br /> to the eastbound SR 826 from intercostal bridge to SR AlA (Collins Avenue). The improvement included the reduction of <br /> existing pavement width from five (5) to four (4) lanes by reconstructing and widening of the sidewalk, milling, resurfacing, <br /> restriped with new pavement markings, replace all signs, install new mast arm for pedestrian crossing mid block, and modify <br /> the signal at Collins Avenue to match the new traffic circulation. Other improvements included new decorative street lights, <br /> paver sidewalk, decorative trash receptacles and benches and landscape improvements. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> City Hall Facility, Weston, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2004 2007 <br />c. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project Manager responsible for the preparation of construction documents and specifications for parking area associated <br /> with the City Hall project, including paving, grading, drainage, water distribution system, sewer collection system, utility <br /> coordination, site lighting, permitting, bid and recommendation of award, construction management and project close-out. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Three Village and Country Isles Roadway Improvements, City of PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Weston, Florida 2004 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />d. Project Manager responsible for the a ddition of a 6' bike lane to both sides of Three Village (4,000 LF) and Country Isles Roads <br /> (3,250 LF), new parallel parking, alignment modification along Country Isles Road to improve safety and circulation, removal of <br /> existing swale, construction of curb and gutter and drainage retrofit to eliminate ponding in swales, new sidewalks and brick <br /> paver crosswalks, utility relocation and replacement, landscape adjustment, resurfacing of both street and traffic control <br /> plans. Permitting, bid, recommendation of award and construction management and oversight. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 3 <br />