Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />12. NAME <br />Luis Tellechea, Sr. <br /> <br />Cam fete ane Sectian E far each ke <br />13. ROLE IN THIS CONTRACT <br /> <br />QA/QC Manager <br /> <br />ersan. <br /> <br />14. YEARS EXPERIENCE <br />A. TOTAL B. WITH CURRENT FIRM <br /> <br />45 <br /> <br />3 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />B.S.C.E., Las Villas University, Cuba, 1965 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards. etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 826 (Palmetto Expressway) Improvements Program Design-Build PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Project, Section 2, Miami-Dade County, Florida, FDOT District 6 2011 2011 <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE It] Check if project performed with current firm <br />a. Project Engineer and QC Manager responsible for the widening and reconstruction of the limited access facility from South <br /> of Sunset Drive to North of Southwest 31st Street and includes the Miller Drive (SW 56th Street), SR 874 and SR 976 (Bird <br /> Road / SW 40th Street) Interchanges. The proposed improvements include the addition of one general use lane in each <br /> direction; auxiliary lanes between all interchanges; interchange improvements and, operational and safety improvements <br /> along the SR-826 mainline and ramps. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Okeechobee Road (SR 25) Depressed Section From W 12th Avenue to PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> W 19th Street, Hialeah, Florida, FDOT District 6 2004 2006 <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />b. Project Manager for the Florida Department of Transportation overseeing all aspects of Design and Construction for this <br /> one-of-a-kind design-build contract - one of only a few depressed segments of roadway in Florida. The project consisted of <br /> widening and lowering Okeechobee Road in Hialeah from just east of W. 12th Avenue to W. 19th Street under the Florida <br /> East Coast Railroad and Metrorail. The project included installing new drainage - to include a pump system for the <br /> depressed section of the road - street lighting, and pedestrian sidewalk <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> US Route 1 "18-Mile Stretch", Miami, Florida, FDOT District 6 PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2002 On going <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />c. FOOT Project Manager responsible for overseeing all the design aspects of this five-section, eighteen-mile rural <br /> reconstruction project. Challenges involve minimizing wetland impacts and maintaining water quality. The project includes <br /> a 65', high-level and a two-mile, elevated causeway over Lake Surprise. The project is highly controversial, which includes <br /> extensive public involvement efforts and requires permits from the U.S. Army Corps of Engineers and the South Florida <br /> Water Management District. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Widening of 4 miles of concrete pavement of 1-95 in Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> County from South of NW 62nd Street to North of NW 125th Street <br /> for FDOT District 6 <br />d. (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Lead Highway Engineer for the final design of this complex highway improvement project that included widening of several <br /> bridges, lighting, drainage, signing and pavement marking, and several traffic operation improvements along the on/off <br /> ramps and frontage roads. This project also included a very intricate maintenance of traffic scheme to maintain <br /> uninterrupted access to the general purpose lanes of this interstate facility. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 4 <br />