Laserfiche WebLink
<br />12. NAME <br />Juan Fuentes, P.E., LEED AP <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />Com fete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br /> <br />Structural Engineer, Building <br /> <br /> <br />14. YEARS EXPERIENCE <br />A. TOTAL B. WITH CURRENT FIRM <br /> <br />10 <br /> <br />2 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />B.S.C.E., University of Miami, 2000 Professional Engineer, Florida #62426 <br />B.S.A.E., University of Miami, 2000 Structural Engineer, Illinois #081006736 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations, Training, Awards, etc.) <br />FSEA, AISC, ACI, LEED Essentials <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Continuing Structural Services eontract, Village of Palmetto Bay, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Miami-Dade County, Florida 2010 I N/A <br />a. <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project manager responsible for the structural assignments of the continuing services contract. This contract intends to <br /> Complement the City's existing staff and resources. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Continuing Structural Services Contract, City of Miami, Miami-Dade PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> County, Florida 2008 I N/A <br />b. (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project manager for the structural assignments of the continuing services contract. This contract is used to implement city's <br /> Capital Improvement Program (CIPl. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Continuing Services Contract with the Miami-Dade County School PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br />C. Board, Miami-Dade County, Florida 2009 I N/A <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Special projects consultant to School Board for miscellaneous structural services <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Open Road Tolling Design Build, Miami-Dade County, Florida, Miami PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Dade Expressway Authority (MDX) 2009 I On Going <br />d. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Structural Engineer of Record for new $18M landmark tolling structures for SR 924, 878, and 874. The project included 8 <br /> new structures with varying multiple spans of 80'-0" to a single span of 160'-0". Innovative concepts were used to reduce <br /> cost of each gantry. Special attention and detailing was required to meet roadway clearances, vibration, and deflection <br /> guidelines of the system operator. The project also included support structures and repaving of existing highways. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Deering Estate Weir Glade Rehydration Project, Miami-Dade County, PROFESSIONAL SERVICES I CONSTRUCTION (If applicable) <br /> Florida 2008 12009 <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />e. Project engineer for the design of a weir structure located on the Deering Estate, immediately adjacent to a historic rock <br /> bridge. The weir consisted of cast-in-place retaining wall with interchangeable wood panels to allow the owner to vary the <br /> amount of water impounded behind the structure. The weir was designed to aesthetically blend in with its surrounding <br /> environment. Consideration of construction methods and equipment was required due to the lack of access to the weir <br /> location and to minimize the damage to the environment from construction activities. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 5 <br />