Laserfiche WebLink
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />12. NAME <br /> <br />Felix Diaz, Ph.D. <br /> <br />Com fete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br /> <br />Structural Engineer, Building <br /> <br />erson. <br /> <br />14. YEARS EXPERIENCE <br />A. TOTAL B. WITH CURRENT FIRM <br /> <br />32 <br /> <br />2 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />Doctorial in Technical Science, Czech Technical University, <br />Ph.D., 1991 <br />Civil Engineering, Polytechnic University of Havana, 1997 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training, Awards. etc.) <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 4041 Warehouse Recertification, Miami-Dade County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2009 N/A <br />a. (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE iii Check if project performed with current firm <br /> Project Engineer responsible for inspection, structural calculations and repair details. Details included replacement of the <br /> roof deck. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Downtown Doral Vista Blanca Tower & Vista Blanca Town Homes, PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Miami, Florida 2007 <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />b. Project engineer responsible for the design and preparation of construction documents for 19, 15, 11 &, 5 story reinforced <br /> concrete buildings supported on deep and shallow foundations. Shear walls required f'c=7000 psi due to high shear. Special <br /> detailing was required for expansion joint. Provided construction administration services that included responding to <br /> information. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Village at Doral Commercial (Bldg. L-l), Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2006 N/A <br />C. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project engineer responsible for the design and construction documents for 5 story reinforced concrete building supported <br /> on shallow foundations. Provided analysis and design for the gravity and lateral system. Structural design incorporated <br /> elevator and stairs cores as shear walls. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Havana Lofts Condominium, Miami, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2005-2006 2006-2007 <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />d. Project engineer responsible for the design and preparation of construction documents for 15-story reinforced concrete <br /> building supported on shallow foundations. Shear walls required high strength concrete due to high shear. Special detailing <br /> was required for ornamental wall. Provided construction administration services that included responding to contractor <br /> requests for information, shop drawing review and change order requests. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 6 <br />