Laserfiche WebLink
<br />12. NAME <br />Ariel Millan, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />Com fete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br />Roadway/Highway Design <br /> <br /> <br />14. YEARS EXPERIENCE <br />A. TOTAL B. WITH CURRENT FIRM <br /> <br />15 <br /> <br />5 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />M.S.C.E., Florida International University, 1999 Professional Engineer, Florida #54572 <br />B.S.C.E., Florida International University, 1995 Professional Engineer, Texas #87326 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards. etc.) <br />Streamline Technology ICPR Hands on Training FDOT Specifications Package Preparation Training <br />Advanced Work Zone Traffic Control <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 826 (Palmetto Expressway) Improvements Program Design-Build PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Project, Section 2, Miami-Dade County, Florida, FOOT District 6 2011 2011 <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />a. Project Manager and Engineer of Record for the widening and reconstruction of the limited access facility from South of <br /> Sunset Drive to North of Southwest 31st Street and includes the Miller Drive (SW 56th Street), SR 874 and SR 976 (Bird Road <br /> / SW 40th Street) Interchanges. The proposed improvements include the addition of one general use lane in each direction; <br /> auxiliary lanes between all interchanges; interchange improvements and, operational and safety improvements along the <br /> SR-826 mainline and ramps. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> The Port of Miami Tunnel, Miami-Dade County, Florida, FOOT District PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 6 and City of Miami 2007 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />b. Roadway Engineer responsible for the design of arterial roads, miscellaneous auxiliary structures, conducting traffic analysis, <br /> drainage design and permitting for The Port of Miami Project. The project consists of the construction of a tunnel under <br /> Government Cut Channel to MacArthur Causeway in the middle of Watson Island to improve access to the Port and to <br /> satisfy present and future growing traffic needs of the Port. In addition, the project would eliminate port traffic from the <br /> downtown city area by diverting it more directly to the Interstate highway system. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SW 137th Avenue between the HEFT and US-1, Miami-Dade, Florida, PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Miami-Dade County Public Works Department (MDPWD) On-Going N/A <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE Check if project performed with current firm <br />c. <br /> Project Manager responsible for overseeing the preparation of design plans, drainage reports, lighting, signing and <br /> pavement markings and permitting for the improvements to SW 137th Avenue from an undivided two-lane rural section to <br /> a 4-lane section. Design services include planning, traffic operations, roadway, design of a closed drainage system, Signing <br /> and Pavement Marking, signalization, roadway lighting and Public involvement. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SW 268/264 Street Connector Miami-Dade, Florida, Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> County Public Works Department (MDPWD) On-Going <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />d. Project Engineer responsible for all aspects in the preparation of design plans, drainage reports, lighting, signing and <br /> pavement markings and permitting for the improvements to SW 268th Street from a 4-lane undivided section to a 5-lane <br /> section from SW 142nd Avenue to SW 122nd Avenue with a two-way left turn lane and a 4-lane divided section with a <br /> median separator from SW 122nd Avenue to SW 112th Avenue. The project will include curb & gutter, sidewalk (in <br /> developed sections) and bicycle lanes throughout the project limits. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 9 <br />