|
<br />12. NAME
<br />Ariel Millan, P.E.
<br />
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />
<br />Com fete one Section E for each ke
<br />13. ROLE IN THIS CONTRACT
<br />Roadway/Highway Design
<br />
<br />
<br />14. YEARS EXPERIENCE
<br />A. TOTAL B. WITH CURRENT FIRM
<br />
<br />15
<br />
<br />5
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />M.S.C.E., Florida International University, 1999 Professional Engineer, Florida #54572
<br />B.S.C.E., Florida International University, 1995 Professional Engineer, Texas #87326
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards. etc.)
<br />Streamline Technology ICPR Hands on Training FDOT Specifications Package Preparation Training
<br />Advanced Work Zone Traffic Control
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SR 826 (Palmetto Expressway) Improvements Program Design-Build PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Project, Section 2, Miami-Dade County, Florida, FOOT District 6 2011 2011
<br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br />a. Project Manager and Engineer of Record for the widening and reconstruction of the limited access facility from South of
<br /> Sunset Drive to North of Southwest 31st Street and includes the Miller Drive (SW 56th Street), SR 874 and SR 976 (Bird Road
<br /> / SW 40th Street) Interchanges. The proposed improvements include the addition of one general use lane in each direction;
<br /> auxiliary lanes between all interchanges; interchange improvements and, operational and safety improvements along the
<br /> SR-826 mainline and ramps.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> The Port of Miami Tunnel, Miami-Dade County, Florida, FOOT District PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> 6 and City of Miami 2007 N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br />b. Roadway Engineer responsible for the design of arterial roads, miscellaneous auxiliary structures, conducting traffic analysis,
<br /> drainage design and permitting for The Port of Miami Project. The project consists of the construction of a tunnel under
<br /> Government Cut Channel to MacArthur Causeway in the middle of Watson Island to improve access to the Port and to
<br /> satisfy present and future growing traffic needs of the Port. In addition, the project would eliminate port traffic from the
<br /> downtown city area by diverting it more directly to the Interstate highway system.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SW 137th Avenue between the HEFT and US-1, Miami-Dade, Florida, PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> Miami-Dade County Public Works Department (MDPWD) On-Going N/A
<br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE Check if project performed with current firm
<br />c.
<br /> Project Manager responsible for overseeing the preparation of design plans, drainage reports, lighting, signing and
<br /> pavement markings and permitting for the improvements to SW 137th Avenue from an undivided two-lane rural section to
<br /> a 4-lane section. Design services include planning, traffic operations, roadway, design of a closed drainage system, Signing
<br /> and Pavement Marking, signalization, roadway lighting and Public involvement.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> SW 268/264 Street Connector Miami-Dade, Florida, Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> County Public Works Department (MDPWD) On-Going
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br />d. Project Engineer responsible for all aspects in the preparation of design plans, drainage reports, lighting, signing and
<br /> pavement markings and permitting for the improvements to SW 268th Street from a 4-lane undivided section to a 5-lane
<br /> section from SW 142nd Avenue to SW 122nd Avenue with a two-way left turn lane and a 4-lane divided section with a
<br /> median separator from SW 122nd Avenue to SW 112th Avenue. The project will include curb & gutter, sidewalk (in
<br /> developed sections) and bicycle lanes throughout the project limits.
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 9
<br />
|