Laserfiche WebLink
<br />12. NAME <br />Elia Nunez, P.E. <br /> <br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />Com fete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br />Roadway/Highway Design <br /> <br /> <br />14. YEARS EXPERIENCE <br />A. TOTAL B. WITH CURRENT FIRM <br /> <br />10 <br /> <br />4 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />B.S.C.E., University of Miami, 2000 Professional Engineer, Florida #66276 <br />B.S.A.E., University of Miami, 2000 Professional Engineer, District of Columbia #901940 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications, Organizations. Training, Awards, etc.) <br />Streamline Technology ICPR Hands on Training FOOT Specifications Package Preparation Training <br />Advanced Work Zone Traffic Control <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> SR 826 (Palmetto Expressway) Improvements Program Design-Build PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Project, Section 2, Miami-Dade County, Florida, FDOT District 6 2011 2011 <br />a. (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Responsible for the preparation of the Typical Section Packages, Pavement Design Packages, Design Variations and Design <br /> Exceptions needed for the project. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 1-75 PD&E Project Study From north of the Homestead Extension of PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Florida's Turnpike (HEFT) interchange in Miami-Dade County to the 1- <br /> 595 interchange in Broward County. Miami-Dade and Broward 2007 N/A <br /> Counties, Florida, FOOT District 4and 6 <br />b. (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project Engineer responsible for the drainage master plans and permitting to include the hydrology and hydraulic <br /> calculations; water quality and water quantity permitting calculations; and pre-development and post-development <br /> drainage modeling. The study included alternatives for the possible addition of reversible/special use and auxiliary lanes <br /> and interchange improvements as well as a dedicated transit way adjacent to the highway with stations at appropriate <br /> intervals. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> 1-595 eorridor Design Consultant from 1-75/Sawgrass Expressway PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Interchange west of 136th Avenue to 1-95, Broward County, Florida, 2007 <br /> FOOT District 4 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />c. <br /> Project Engineer responsible for the drainage master plans and permitting to include the hydrology and hydraulic <br /> calculations; water quality and water quantity permitting calculations; and pre-development and post-development <br /> drainage modeling. The project consist of the Widening of 1-595 from the 1-75/Sawgrass Expressway interchange to east of <br /> the 1-95 interchange. The proposed widening will include reversible lanes in the median serving express traffic between 1-75 <br /> and 1-95 with direct connections to Florida's Turnpike. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Kendal Drive at SW 99th Court (SR 99) Safety Improvement Project, PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Florida, FDOT District 6 <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />d. Project Manager and Engineer of Record responsible for the development of the roadway plans, signing and pavement <br /> marking plans, pavement design package, design variations and exception packages, and typical section package for the <br /> Kendal Drive at SW 99th Court safety improvement project. The design was to reduce accident frequency at the intersection <br /> based on the safety report. The safety recommendations included reducing the median width, border width and travel <br /> lanes to offset the left-turn bays to improve the alignment and visibility on all approaches and reduce the number of <br /> crashes. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 10 <br />