|
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT
<br />
<br />12. NAME
<br />Ivonne Planas, P.E.
<br />
<br />Com fete one Section E for each ke
<br />13. ROLE IN THIS CONTRACT
<br />
<br />Utility Design
<br />
<br />erson.
<br />
<br />14. YEARS EXPERIENCE
<br />A. TOTAL B. WITH CURRENT FIRM
<br />
<br />13
<br />
<br />4
<br />
<br />15. FIRM NAME AND LOCATION (City and State)
<br />BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156
<br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline)
<br />BSCE, University of Havana, 1996 Professional Engineer, Florida #67358
<br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations. Training, Awards, etc.)
<br />
<br />19. RELEVANT PROJECTS
<br />
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Miami Shores Undersized Water Main Replacement, Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> County, Florida, Miami Dade Water and Sewer Department 2009 2010
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br />a. Engineer of Record responsible for the plans preparation and design for the new 8" DIP water main and permitting with
<br /> Miami-Dade DERM, Miami-Dade Fire Department and the Florida Department of Health. The Project consisted of the design
<br /> of a 2,100 LF of 8" D.I.P. water main in order to replace existing 2", 2y," and 3" mains running within the public right of way
<br /> including the installation of fire hydrants, consistent with County requirements and standards. This system was to improve
<br /> the water pressure and fire protection capabilities in the residential area.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> 10" Force Main along NW 7th Avenue between NW 11th Street and PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> NW 14th Street and along NW 14th Street between 7th Avenue and
<br /> Pump Station No.7, Miami-Dade County, Florida, Miami Dade Water 2010 2010
<br />b. and Sewer Department
<br />(3) BRIEF DESCRIPTION (Brief scope, size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br /> Engineer of Record responsible for the plans preparation and design of the 10" force main including continuous coordination
<br /> with the client/owner, sub-consultants and permitting agencies from the onset of a project through its completion.
<br /> Engineering services included Surveying, geotechnical, design limited construction management for approximately 1900 L.F.
<br /> of 10" Force Main.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> City of Miami Undersized Water Main Replacement, Miami-Dade PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> County, Florida, Miami Dade Water and Sewer Department 2009 2010
<br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br />c. Engineer of Record responsible for the plans preparation and design for the new 8" DIP water main including permitting
<br /> with Miami-Dade DERM, Miami-Dade Fire Department and the Florida Department of Health. Project consisted of the
<br /> design for the replacement of 5,600 LF of D.I.P. 8" water mains replacing an undersized system. The project also included
<br /> the installation of fire hydrants, consistent with County requirements and standards, and water service lines to provide
<br /> service to all abutting properties. The upgrades improved the water pressure and fire protection capabilities in the
<br /> residential area.
<br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED
<br /> Silver Palms Caribe, Miami-Dade County, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable)
<br /> 2004 2005
<br />d. (3) BRIEF DESCRIPTION (Brief scope. size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm
<br /> Project Engineer responsible for the development and preparation of the design plans including coordination with the client,
<br /> sub-consultants and permitting agencies. Project included design of paving, grading, drainage, 11,600 LF of 8" DIP water
<br /> main, 9,000 LF of 8" PVC sanitary sewer, 4,000 LF of 12" DIP force main and a donation pump station for a 38.8 Acre site.
<br />
<br />STANDARD FORM 330 (6/2004) PAGE 11
<br />
|