My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
BCC Engineering
SIBFL
>
City Clerk
>
Bids-RFQ-RFP
>
RFQ
>
(10-04-01) Prof. Engineering Svcs.
>
Responses
>
BCC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2010 9:19:36 AM
Creation date
11/18/2010 9:19:18 AM
Metadata
Fields
Template:
CityClerk-Bids_RFP_RFQ
Project Name
Prof. Engineering Svcs.
Bid No. (xx-xx-xx)
10-04-01
Project Type (Bid, RFP, RFQ)
RFQ
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />E. RESUMES OF KEY PERSONNEL PROPOSED FOR THIS CONTRACT <br /> <br />12. NAME <br />Ricardo Ayala, P.E. <br /> <br />Com fete one Section E for each ke <br />13. ROLE IN THIS CONTRACT <br /> <br />Site Development <br /> <br />erson. <br /> <br />14. YEARS EXPERIENCE <br />A. TOTAL B. WITH CURRENT FIRM <br /> <br />11 <br /> <br />1 <br /> <br />15. FIRM NAME AND LOCATION (City and State) <br />BCC Engineering, Inc., 7300 North Kendall Drive, #400, Miami, Florida 33156 <br />16. EDUCATION (Degree and Specialization) 17. CURRENT PROFESSIONAL REGISTRATION (State and Discipline) <br />B.S.C.E, Colombian School of Engineering, 1999 Professional Engineer, Florida #69950 <br />18. OTHER PROFESSIONAL QUALIFICATIONS (Publications. Organizations, Training. Awards, etc.) <br />Advanced Work Zone Traffic Control <br /> <br />19. RELEVANT PROJECTS <br /> <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Naranja Self-Storage Facility, Homestead, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2008 2009 <br /> (3) BRIEF DESCRIPTION (Brief scope. size. cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />a. Project Engineer responsible for design services as well as construction documents for the civil portion of a 4 story self- <br /> storage facility. Design included 650 LF of exfiltration trench, milling & resurfacing SW 272nd Street, a driveway connection <br /> permit for the new driveway abutting US-I, site grading, fire and domestic water services. The project also included <br /> obtaining permits from FOOT District 6, Miami-Dade County Building Department, DERM and acquisition of an <br /> Environmental Resource Permit (ERP) from the South Florida Water Management. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Colonnade, Miami, Florida, Lennar Homes. PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2005-2006 2006-2007 <br /> (3) BRIEF DESCRIPTION (Brief scope, size. cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br /> Project Engineer responsible for design services as well as preparing construction documents for the civil engineering <br />b. services for a 570 condominium/apartment units along SW 72nd Ave south of SW 82nd St and north of Snapper Creek Canal. <br /> The scope of work included water, sewer, paving, grading and drainage systems design as well as off-site roadway <br /> improvements associated with a Miami-Dade County section line road as well as pavement marking and signage. <br /> Coordinated all permitting through Miami-Dade County Public Works, Miami-Dade Water & Sewer, DERM and the South <br /> Florida Water Management District and all the utility coordination on the public right-of-way to avoid conflicts within the <br /> proposed layout of the new utilities. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> Continental Hotel, Miami Beach, Florida PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> 2008-2009 N/A <br /> (3) BRIEF DESCRIPTION (Brief scope, size, cost, etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />c. Project Engineer responsible for civil engineering design services and permitting efforts associated with the redevelopment <br /> of this existing hotel on Collins Avenue in South Beach. Assisted with coordination of coastal construction line permitting, <br /> design of trench drains at drop-off areas, paving grading and drainage around the existing pool area and coordinated with <br /> FDOT with respect to special permit and drainage connection permit. Environmental Resource Permit was required by <br /> FDEP. The project also included the design and coordination of a private lift station. <br /> (1) TITLE AND LOCATION (City and State) (2) YEAR COMPLETED <br /> University of Miami Merrick and Memorial Building Water Main PROFESSIONAL SERVICES CONSTRUCTION (If applicable) <br /> Extension, Coral Gables, Florida 2008 2008 <br /> (3) BRIEF DESCRIPTION (Brief scope. size, cost. etc.) AND SPECIFIC ROLE o Check if project performed with current firm <br />d. Project Engineer responsible for design services and construction documents for 3000 LF of 12" water main to provide <br /> additional fire protection to the Merrick and Memorial Buildings. The installation of the water main required coordination <br /> with the utility owner and the contractor due to lack of existing utilities information along the proposed layout. Several soft <br /> digs were performed to facilitate the details for any utility conflict so the schedule on the project will not be impacted due <br /> to conflict delays. <br /> <br />STANDARD FORM 330 (6/2004) PAGE 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.